Sample Record
DIME Sample ID 2019-07-26-10
Sample is locked from editing. info
Project Information
| Project Identifiers | Project ID: 209139 DEA: 071170U4 EFIS: 0700000085 |
|---|---|
| DIST-CO-RTE-PM | 07-LA-10-33.2/37.2 |
| Award Date | 02/10/2014 |
| Closeout Date | 03/01/2022 |
| Work Description | CONSTRUCT HOV LANES, WIDEN BRIDGES, AND REALIGN RAMPS. |
| Location Description | LOS ANGELES COUNTY IN BALDWIN PARK AND WEST COVINA FROM 0.1 MILE WEST OF PUENTE AVENUE UNDERCROSSING TO 0.2 MILE EAST OF HOLLENBECK STREET UNDERCROSSING |
| QA Service Level | 1 (Verified on 05/06/2014) |
Owner Lab
- CT D08 - Fontana Southern Regional Laboratory
Sample Information
| Sample Taken Date | 07/26/2019 | Sample Unique Key | 10 |
|---|---|---|---|
| Date that the sample was received by the laboratory/organization performing the testing | 07/30/2019 | Sample type | Quality Assurance |
| A brief description of the sample | 6x12 concrete cylinders | The quantity of what the sample constitutes | 2 |
| From where was the sample collected | Job Site | First name of sampler or witnessed by | Thomas |
| Last name of sampler or witnessed by | Tong | Title of sampler | ASR |
| Telephone number of sampler | Laboratory sample identification | 882-726 | |
| Linked DIME Sample ID | The fabricator/manufacturer/facility name | HOLIDAY ROCK | |
| Transportation Laboratory (TL) Number | 20190726 | Inspector Lot Number from the Transportation Laboratory (TL) Form | |
| Structure unique identifier | Structure name | Puente Bridge E and W Approach slab at middle | |
| Bid Item | Not set |
Material Information
| Material Type | Concrete | The concrete mix design number | CT1-C2400 |
|---|---|---|---|
| The truck number from where the sample was collected | 604 | The batch plant ticket number from where the sample was collected | 101146525 |
| Concrete batch plant | Unknown | The fabricator/manufacturer designation for the sample | AMES CONSTRUCTION |
| A detailed description of where the material sample was collected | 5 cy | Where the material sample would have been placed if not sampled | corna ave approach slab right at both abutmet |
| From Lot No. | Unknown | Bag Lot No. | Unknown |
Submitted Tests
Sample File Attachments
| File Name | Extension | Date Uploaded | Actions |
|---|---|---|---|
| No results found. | |||
Test File Attachments
DIME Test ID: 2019-07-26-10-1 ASTM C39-10 (Verified)
