DIME Sample ID 2019-07-29-2

Sample is locked from editing. info

Project Information

Project IdentifiersProject ID: 208973
DEA: 120H1004
EFIS: 1200000180
COOP: 120670
DIST-CO-RTE-PM12-ORA-405,73,405,605-9.3/24.3
Award Date11/07/2016
Closeout DateNot set
Work Description(Alternative Delivery) San Diego Freeway (I-405) Improvement Project SR-73 to I-605, Design Build Project, Administered by Orange County Transportation Authority, Caltrans METS to perform Source Inspection per RFP.
Location DescriptionOrange and Los Angeles Counties: 12-ORA-405 PM 9.3/24.2 / 07-LA-405 PM 0.0/1.2 12-ORA-22 PM R0.7/R3.8 / 12-ORA-22 PM R0.5/R0.7 12-ORA-73 PM R27.2/R27.8 / 12-ORA-605 PM 3.5/R1.6 07-LA-605 PM R0.0/R1.2
QA Service Level1 (Verified on 09/10/2015)

Sample Information

Sample Taken Date07/29/2019 Sample Unique Key2
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing07/29/2019
Sample typeQuality Control A brief description of the sample#6 UBS Hoops
The quantity of what the sample constitutes183 total Lot 1 and 2 From where was the sample collectedFabricator
First name of sampler or witnessed byDavid Last name of sampler or witnessed byWeeks
Title of samplerASI Telephone number of sampler310-883-8369
Laboratory sample identification Linked DIME Sample ID
The fabricator/manufacturer/facility nameCMC Etiwanda Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) FormL79-165-19 Structure unique identifier
Structure nameFairview Bent 2 Bid ItemNot set

Material Information

Material TypeSMTL TM5 - Welded Hoops Production or Authorization TestingProduction Testing
Service or UltimateUltimate Rebar Heat Number(s)4087478
Hoop Manufacturer Lot Number(s)1 and 2 Material Standard CodeASTM A706
Material Grade60 Rebar Size6
Diameter of Hoop4'-8" Epoxy CoatedNo
Epoxy Coating ColorNA Rebar ManufacturerCMC
Welding CompanyCMC Rebar (Etiwanda) Coating StandardsUncoated
Weld TypeFlash Welded

Submitted Tests

DIME Test IDTest MethodTester Name, Testing LabDate TestedDate AddedVerified?Release DateTest CommentsPrivacy LevelActions
2019-07-29-2-1CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile)Brian, CT HQ - Sacramento Structural Materials Testing Laboratory07/31/201907/31/2019
Yes
07/31/2019Bar Broke; OK NeckingPublic - Test Data Visible
2019-07-29-2-2CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile)Brian, CT HQ - Sacramento Structural Materials Testing Laboratory07/31/201907/31/2019
Yes
07/31/2019Bar Broke; OK NeckingPublic - Test Data Visible
2019-07-29-2-3CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile)Brian, CT HQ - Sacramento Structural Materials Testing Laboratory07/31/201907/31/2019
Yes
07/31/2019Bar Broke; OK NeckingPublic - Test Data Visible
2019-07-29-2-4CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile)Brian, CT HQ - Sacramento Structural Materials Testing Laboratory07/31/201907/31/2019
Yes
07/31/2019Bar Broke; OK NeckingPublic - Test Data Visible
2019-07-29-2-5CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile)Brian, CT HQ - Sacramento Structural Materials Testing Laboratory07/31/201907/31/2019
Yes
07/31/2019Bar Broke; OK NeckingPublic - Test Data Visible
2019-07-29-2-6CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile)Brian, CT HQ - Sacramento Structural Materials Testing Laboratory07/31/201907/31/2019
Yes
07/31/2019Bar Broke; OK NeckingPublic - Test Data Visible

Sample File Attachments

File NameExtensionDate UploadedActions
No results found.

Test File Attachments


DIME Test ID: 2019-07-29-2-1 CTM 670-December 2013 (Verified)
DIME Test ID: 2019-07-29-2-2 CTM 670-December 2013 (Verified)
DIME Test ID: 2019-07-29-2-3 CTM 670-December 2013 (Verified)
DIME Test ID: 2019-07-29-2-4 CTM 670-December 2013 (Verified)
DIME Test ID: 2019-07-29-2-5 CTM 670-December 2013 (Verified)
DIME Test ID: 2019-07-29-2-6 CTM 670-December 2013 (Verified)