Sample Record

DIME Sample ID 2019-04-30-8

Sample is locked from editing. info

Project Information

Project IdentifiersProject ID: 208973
DEA: 120H1004
EFIS: 1200000180
COOP: 120670
DIST-CO-RTE-PM12-ORA-405,73,405,605-9.3/24.3
Award Date11/07/2016
Closeout DateNot set
Work Description(Alternative Delivery) San Diego Freeway (I-405) Improvement Project SR-73 to I-605, Design Build Project, Administered by Orange County Transportation Authority, Caltrans METS to perform Source Inspection per RFP.
Location DescriptionOrange and Los Angeles Counties: 12-ORA-405 PM 9.3/24.2 / 07-LA-405 PM 0.0/1.2 12-ORA-22 PM R0.7/R3.8 / 12-ORA-22 PM R0.5/R0.7 12-ORA-73 PM R27.2/R27.8 / 12-ORA-605 PM 3.5/R1.6 07-LA-605 PM R0.0/R1.2
QA Service Level1 (Verified on 09/10/2015)

Owner Lab

  • CT HQ - QASI Los Angeles Field Office

Sample Information

Sample Taken Date04/30/2019 Sample Unique Key8
Date that the sample was received by the laboratory/organization performing the testing05/03/2019 Sample typeQuality Assurance
A brief description of the sample4-#9 Lenton IP8395 & IP8396 Couplers with reinforcement The quantity of what the sample constitutes1500
From where was the sample collectedJob Site First name of sampler or witnessed byMatt
Last name of sampler or witnessed byRuiz Title of sampler
Telephone number of sampler Laboratory sample identification
Linked DIME Sample ID The fabricator/manufacturer/facility nameCMC Rebar Erico Lenton
Transportation Laboratory (TL) Number Inspector Lot Number from the Transportation Laboratory (TL) Form
Structure unique identifier Structure name
Bid ItemNot set

Material Information

Material TypeSMTL TM5 - Couplers Production or Authorization TestingProduction Testing
Service or UltimateUltimate Material Standard CodeASTM A615
Material Grade60 Rebar ManufacturerUnknown
Coupler ManufacturerLenton Intermediate Assembler or FabricatorUnknown
Rebar Size9 Coupler ModelIP8395 IP8396
Coating StandardsUncoated Shape of RebarStraight
Rebar Hoop DiameterUnknown Rebar Hoop FabricatorUnknown
Coupler Component Heat/Lot Number(s)1 Rebar Heat Number(s)Unknown
Rebar Size 2 Coupler Unique IDNot set

Submitted Tests

DIME Test IDTest MethodTester Name, Testing LabDate TestedDate AddedVerified?Release DateTest CommentsPrivacy LevelActions
2019-04-30-8-1CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile Slip)Brian, CT HQ - Sacramento Structural Materials Testing Laboratory05/20/201905/20/2019
Yes
05/28/2019Bar Broke, Ok NeckingPublic - Test Data Visible
2019-04-30-8-2CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile Slip)Brian, CT HQ - Sacramento Structural Materials Testing Laboratory05/20/201905/20/2019
Yes
05/28/2019Bar Broke, Ok NeckingPublic - Test Data Visible
2019-04-30-8-3CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile Slip)Brian, CT HQ - Sacramento Structural Materials Testing Laboratory05/20/201905/20/2019
Yes
05/28/2019Bar Broke, Ok NeckingPublic - Test Data Visible

Sample File Attachments

File NameExtensionDate UploadedActions
No results found.

Test File Attachments


DIME Test ID: 2019-04-30-8-1 CTM 670-December 2013 (Verified)
DIME Test ID: 2019-04-30-8-2 CTM 670-December 2013 (Verified)
DIME Test ID: 2019-04-30-8-3 CTM 670-December 2013 (Verified)