Sample Record

Owner Lab

  • CT HQ - Sacramento Hot Mix Asphalt Laboratory

DIME Sample ID 2019-01-04-30

Project Information

Project IdentifiersProject ID: 66667
DEA: JMFPP
EFIS: 0019000043
DIST-CO-RTE-PM59---
Award DateNot set
Closeout DateNot set
Work DescriptionSpecial project for submitting Sample information for JMF Prequalification Program.
Location DescriptionNot set
QA Service LevelNOT VERIFIED

Sample Information

Sample Taken Date01/04/2019 Sample Unique Key30
Date that the sample was received by the laboratory/organization performing the testing01/04/2019 Sample typeQuality Control
A brief description of the sampleRAP The quantity of what the sample constitutesJMF
From where was the sample collectedSource First name of sampler or witnessed byCarlos
Last name of sampler or witnessed byManzo Title of samplerQC Technician
Telephone number of sampler805-440-7390 Laboratory sample identificationTEM34SPLA
Linked DIME Sample ID The fabricator/manufacturer/facility nameSPM-Templeton
Transportation Laboratory (TL) Number Inspector Lot Number from the Transportation Laboratory (TL) Form
Structure unique identifierNot set Structure nameNot set
Bid ItemNot set

Material Information

Material TypeReclaimed Asphalt Pavement RAP SourceStockpile
Aggregate Size1/2 Aggregate Source
RAP Stockpile Stockpile Size (tons)
Reclaimed Asphalt Pavement Mix NumberNot set

Submitted Tests

DIME Test IDTest MethodTester Name, Testing LabDate TestedDate AddedVerified?Release DateTest CommentsPrivacy LevelActions
2019-01-04-30-1AASHTO T30-15: Standard Method of Test for Mechanical Analysis of Extracted Aggregate (Mechanical Analysis)Gurpartap Grewal, CT HQ - Sacramento Hot Mix Asphalt Laboratory01/04/2019
Yes
04/02/2019Rap Sample 3 T-30Public - Test Data Visible

Sample File Attachments

File NameExtensionDate UploadedActions
No results found.

Test File Attachments


DIME Test ID: 2019-01-04-30-1 AASHTO T30-15 (Verified)