Sample Record

DIME Sample ID 2019-01-07-5

Project Information

Project IdentifiersProject ID: 99999
DEA: 0322222
DIST-CO-RTE-PM03-SAC,OMG-888,99,80-0.6-0.6
Award DateNot set
Closeout DateNot set
Work DescriptionTHIS PROJECT RECORD WAS ADDED FOR DIME TESTERS - DATA SUBMITTED FOR THIS PROJECT SHOULD NOT BE USED FOR ANY OTHER PURPOSES.
Location DescriptionTHIS PROJECT RECORD WAS ADDED FOR DIME TESTERS - DATA SUBMITTED FOR THIS PROJECT SHOULD NOT BE USED FOR ANY OTHER PURPOSES.
QA Service Level (Verified on 04/05/2013)

Owner Lab

  • CT HQ - Sacramento Hot Mix Asphalt Laboratory

Sample Information

Sample Taken Date01/07/2019 Sample Unique Key5
Date that the sample was received by the laboratory/organization performing the testing01/04/2019 Sample typeVerification
A brief description of the sampleaggregate The quantity of what the sample constitutes60
From where was the sample collectedJob Site First name of sampler or witnessed byvulcan materials
Last name of sampler or witnessed byabc Title of sampler
Telephone number of sampler Laboratory sample identification
Linked DIME Sample ID The fabricator/manufacturer/facility namevulcan materials
Transportation Laboratory (TL) Number Inspector Lot Number from the Transportation Laboratory (TL) Form
Structure unique identifierNot set Structure nameNot set
Bid ItemNot set

Material Information

Material TypeAggregate Source Identification (SMARA, name of Pit or Job Site)91-01-0010
The fabricator's/manufacturer's product name for the sampleUnknown The fabricator/manufacturer designation for the sampleUnknown
The plant numberUnknown A detailed description of where the material sample was collectedstock pile
Where the material sample would have been placed if not sampledUnknown Primary Aggregate Nominal Size1/2 inch
The concrete mix design numberUnknown Lot numberUnknown
Sublot numberUnknown Aggregate Mix NumberNot set

JMF Information

HMA Design IDJMF3512-2019-67-Test Date Created01/28/2019
Submittal
Show (8)
JMF3511-208-2019-69 Submittal In Progress
JMF3511-208-2019-71 Submittal Completeness Review Failed
JMF3511-208-2019-72 Submittal Completeness Review Failed
JMF3511-208-2019-113 Submittal In Progress
JMF3511-208-2020-220 Submittal In Progress
JMF3511-208-2021-6 Submittal Accepted for Verification| JMF3513-2021-6
JMF3511-208-2021-8 Submittal Rejected For Use| JMF3513-2021-13
JMF3511-208-2021-16 Submittal Completeness in Review

Submitted Tests

DIME Test IDTest MethodTester Name, Testing LabDate TestedDate AddedVerified?Release DateTest CommentsPrivacy LevelActions
No results found.

Sample File Attachments

File NameExtensionDate UploadedActions
No results found.

Test File Attachments