Sample Record

DIME Sample ID 2018-05-22-23

Sample is locked from editing. info

Project Information

Project IdentifiersProject ID: 212997
DEA: 023H2104
EFIS: 0217000070
DIST-CO-RTE-PM02-PLU-70,89-53.5/58.4,21.0/29.9
Award Date03/02/2018
Closeout Date01/09/2019
Work DescriptionAC OVERLAY, REPLACE AC SURFACE, GUARDRAIL, SHOULDER BACKING
Location DescriptionPLUMAS COUNTY ON ROUTE 70 FROM GREENHORN RANCH ROAD TO 0.2 MILE EAST OF SLOAT ROAD AND ON ROUTE 89 FROM 0.3 MILE SOUTH OF ALTA CAMP ROAD TO CANYON DAM PICNIC AREA
QA Service Level1 (Verified on 02/02/2018)

Owner Lab

  • CT D02 - Redding Northern Regional Laboratory

Sample Information

Sample Taken Date05/22/2018 Sample Unique Key23
Date that the sample was received by the laboratory/organization performing the testing05/23/2018 Sample typeVerification
A brief description of the sampleCombined RAP The quantity of what the sample constitutesJMF Verification
From where was the sample collectedManufacturer First name of sampler or witnessed byLynn
Last name of sampler or witnessed byHunnicutt Title of samplerUnknown
Telephone number of samplerUnknown Laboratory sample identificationD77416
Linked DIME Sample IDUnknown The fabricator/manufacturer/facility nameLockwood Hot Plant
Transportation Laboratory (TL) Number894815 Inspector Lot Number from the Transportation Laboratory (TL) FormJMF 18-12-S1
Structure unique identifierNot set Structure nameNot set
Bid ItemNot set

Material Information

Material TypeReclaimed Asphalt Pavement RAP SourceLockwood Hot Plant
Aggregate Size3/8-inch Aggregate SourceUnknown
RAP StockpileContinuous Stockpile Size (tons)20000
Reclaimed Asphalt Pavement Mix NumberNot set HMA PayNo

JMF Information

Verification IDJMF3513-2018-45 Date Created12/17/2018
JMF Submittal IDJMF3511-22-2018-62 JMF StatusSubmittal Rejected For Use
Producer Mix ID1515 Rejected Date12/20/2018

Submitted Tests

DIME Test IDTest MethodTester Name, Testing LabDate TestedDate AddedVerified?Release DateTest CommentsPrivacy LevelActions
2018-05-22-23-1AASHTO T308-10: Standard Method of Test for Determining the Asphalt Binder Content of Hot Mix Asphalt (HMA) by the Ignition Method (Method A) (Asphalt Binder Content)Colt Sweeny, CT D02 - Redding Northern Regional Laboratory05/25/2018
Yes
12/17/2018Public - Test Data Visible
2018-05-22-23-2AASHTO T30-15: Standard Method of Test for Mechanical Analysis of Extracted Aggregate (Mechanical Analysis)NRML-R, CT D02 - Redding Northern Regional Laboratory05/28/2018
Yes
12/17/2018Public - Test Data Visible
2018-05-22-23-3AASHTO T209-12: Standard Method of Test for Theoretical Maximum Specific Gravity (Gmm) and Density of Asphalt Mixtures (Maximum Specific Gravity)NRML-R, CT D02 - Redding Northern Regional Laboratory05/27/2018
Yes
12/17/2018Public - Test Data Visible

Sample File Attachments

File NameExtensionDate UploadedActions
No results found.

Test File Attachments


DIME Test ID: 2018-05-22-23-1 AASHTO T308-10 (Verified)
DIME Test ID: 2018-05-22-23-2 AASHTO T30-15 (Verified)
DIME Test ID: 2018-05-22-23-3 AASHTO T209-12 (Verified)