Sample Record

DIME Sample ID 2018-06-23-3

Project Information

Project IdentifiersProject ID: 212408
DEA: 09350804
EFIS: 0900020055
DIST-CO-RTE-PM09-MNO-395-80.6/84.1
Award Date07/14/2017
Closeout Date01/06/2020
Work DescriptionCONSTRUCT PULVERIZED ROADBED, HMA AND ANCHORED WIRE MESH SYSTEM.
Location DescriptionMONO COUNTY NEAR BRIDGEPORT FROM BUCKEYE ROAD TO 2.9 MILES SOUTH OF SWAUGER CANYON ROAD
QA Service Level1 (Verified on 05/03/2018)

Owner Lab

  • CT D09 - Bishop Field Laboratory

Sample Information

Sample Taken Date06/23/2018 Sample Unique Key3
Date that the sample was received by the laboratory/organization performing the testingNot set Sample typeQuality Assurance
A brief description of the sampleSTN 10202P50 SB1 820 Tons The quantity of what the sample constitutes750 Tons
From where was the sample collectedJob Site First name of sampler or witnessed byMokhtar
Last name of sampler or witnessed byOuahmane Title of sampler
Telephone number of sampler Laboratory sample identification
Linked DIME Sample ID The fabricator/manufacturer/facility nameHunewell
Transportation Laboratory (TL) Number Inspector Lot Number from the Transportation Laboratory (TL) Form
Structure unique identifierNot set Structure nameNot set
Bid ItemNot set

Material Information

Material TypeHot Mix Asphalt HMA TypeType A HMA
HMA Grading3/4 inch Lot numberNot set
Sublot numberNot set HMA Mix NumberNot set
Binder content (%)Not set Virgin binder PGNot set
Design binder PGNot set Binder SupplierNot set
RAP content (%)Not set WMA AdditivesNot set
Antistrip typeNot set HMA PayNo

Submitted Tests

DIME Test IDTest MethodTester Name, Testing LabDate TestedDate AddedVerified?Release DateTest CommentsPrivacy LevelActions
No results found.

Sample File Attachments

File NameExtensionDate UploadedActions
No results found.

Test File Attachments