Sample Record
DIME Sample ID 2026-10-07-39
Project Information
| Project Identifiers | Project ID: 1001825 DEA: 040J5404 EFIS: 0414000011 |
|---|---|
| DIST-CO-RTE-PM | 04-CC-24-R5.8/R6.2 |
| Award Date | 10/30/2026 |
| Closeout Date | Not set |
| Work Description | Caldecott Tunnel Bores 1, 2, & 3 Rehab |
| Location Description | Not set |
| QA Service Level | 1 (Verified on 11/18/2025) |
Owner Lab
- CT HQ - Vallejo Field Laboratory
Sample Information
| Sample Taken Date | 10/07/2026 | Sample Unique Key | 39 |
|---|---|---|---|
| Date that the sample was received by the laboratory/organization performing the testing | 10/05/2026 | Sample type | Informational |
| A brief description of the sample | Bore-3 Critical section1 | The quantity of what the sample constitutes | Bore-3 Critical section1 |
| From where was the sample collected | Job Site | First name of sampler or witnessed by | Salauddin |
| Last name of sampler or witnessed by | Mohammed | Title of sampler | |
| Telephone number of sampler | Laboratory sample identification | ||
| Linked DIME Sample ID | The fabricator/manufacturer/facility name | Unkown | |
| Transportation Laboratory (TL) Number | Inspector Lot Number from the Transportation Laboratory (TL) Form | ||
| Structure unique identifier | Structure name | ||
| Bid Item | Not set |
Material Information
| Material Type | Concrete Core | Detail description | Caldecott tunnel Bore 3 |
|---|---|---|---|
| Structure names | Caldecott tunnel | Type of material | Concrete core |
Submitted Tests
| DIME Test ID | Test Method | Tester Name, Testing Lab | Date Tested | Date Added | Verified? | Release Date | Test Comments | Privacy Level | Actions |
|---|---|---|---|---|---|---|---|---|---|
| No results found. | |||||||||
Sample File Attachments
| File Name | Extension | Date Uploaded | Actions |
|---|---|---|---|
| No results found. | |||
