Sample Record
DIME Sample ID 2026-08-19-76
Project Information
| Project Identifiers | Project ID: 1001169 DEA: 07314524 EFIS: 0722000300 COOP: 075283 |
|---|---|
| DIST-CO-RTE-PM | 07--- |
| Award Date | 07/03/2023 |
| Closeout Date | Not set |
| Work Description | I-105 METRO Express Lanes Project |
| Location Description | LA-105 PM R0.6/R10.1, LA-110 PM R14.1/R16.6 |
| QA Service Level | 2 (Verified on 04/11/2025) |
Owner Lab
- Alta Vista Solutions - Whittier
Sample Information
| Sample Taken Date | 08/19/2026 | Sample Unique Key | 76 |
|---|---|---|---|
| Date that the sample was received by the laboratory/organization performing the testing | 08/19/2026 | Sample type | Quality Assurance |
| A brief description of the sample | 6x12 concrete cylinders | The quantity of what the sample constitutes | 120 CY |
| From where was the sample collected | Job Site | First name of sampler or witnessed by | Carlos |
| Last name of sampler or witnessed by | Viramontes | Title of sampler | Materials Tester |
| Telephone number of sampler | 5628377377 | Laboratory sample identification | 081926-ID905-105EBJPCP-1 |
| Linked DIME Sample ID | The fabricator/manufacturer/facility name | N/A | |
| Transportation Laboratory (TL) Number | Inspector Lot Number from the Transportation Laboratory (TL) Form | ||
| Structure unique identifier | Structure name | ||
| Bid Item | Not set |
Material Information
| Material Type | Concrete | The concrete mix design number | CT632CPA |
|---|---|---|---|
| The truck number from where the sample was collected | Truck or Ticket 311866 | The batch plant ticket number from where the sample was collected | Load 12 |
| Concrete batch plant | The fabricator/manufacturer designation for the sample | ||
| A detailed description of where the material sample was collected | Jobsite | Where the material sample would have been placed if not sampled | Jobsite |
| From Lot No. | Bag Lot No. |
Submitted Tests
| DIME Test ID | Test Method | Tester Name, Testing Lab | Date Tested | Date Added | Verified? | Release Date | Test Comments | Privacy Level | Actions |
|---|---|---|---|---|---|---|---|---|---|
| 2026-08-19-76-1 | CTM 557-June 2020: Method of Test for Temperature of Freshly Mixed Hydraulic Cement Concrete | Carlos Viramontes, Alta Vista Solutions - Whittier | 08/19/2026 | 10/06/2026 | No | ||||
| 2026-08-19-76-2 | CTM 504-June 2010: Method of Test for Determining Air Content of Freshly Mixed Concrete by the Pressure Method | Carlos Viramontes, Alta Vista Solutions - Whittier | 08/19/2026 | 10/06/2026 | No | ||||
| 2026-08-19-76-3 | CTM 521-June 2020: Method of Test for Compressive Strength of Molded Concrete Cylinders | Carlos Viramontes, Alta Vista Solutions - Whittier | 09/30/2026 | 10/06/2026 | No |
Sample File Attachments
| File Name | Extension | Date Uploaded | Actions |
|---|---|---|---|
| No results found. | |||
Test File Attachments
DIME Test ID: 2026-08-19-76-1 CTM 557-June 2020
DIME Test ID: 2026-08-19-76-2 CTM 504-June 2010
DIME Test ID: 2026-08-19-76-3 CTM 521-June 2020
