Sample Record
DIME Sample ID 2026-09-25-18
Project Information
| Project Identifiers | Project ID: 1001669 DEA: 09379004 EFIS: 0919000004 |
|---|---|
| DIST-CO-RTE-PM | 09-INY-395-R65.0/76.0 |
| Award Date | 12/24/2025 |
| Closeout Date | Not set |
| Work Description | FULL DEPTH RECYCLING, COLD PLANE, HMA AND CURB RAMPS. |
| Location Description | INYO COUNTY AT AND NEAR INDEPENDENCE FROM 3 MILES SOUTH OF MANZANAR REWARD ROAD TO 0.3 MILE NORTH OF SHABBELL LANE |
| QA Service Level | 1 (Verified on 10/13/2025) |
Owner Lab
- CT D09 - Bishop Field Laboratory
Sample Information
| Sample Taken Date | 09/25/2026 | Sample Unique Key | 18 |
|---|---|---|---|
| Date that the sample was received by the laboratory/organization performing the testing | 09/25/2026 | Sample type | Quality Assurance |
| A brief description of the sample | 3/4" HMA Cores | The quantity of what the sample constitutes | 750 Tons |
| From where was the sample collected | Job Site | First name of sampler or witnessed by | Jeff |
| Last name of sampler or witnessed by | Puente | Title of sampler | Consultant |
| Telephone number of sampler | Laboratory sample identification | CR-201 | |
| Linked DIME Sample ID | The fabricator/manufacturer/facility name | RHB Plant Independence | |
| Transportation Laboratory (TL) Number | Inspector Lot Number from the Transportation Laboratory (TL) Form | ||
| Structure unique identifier | Structure name | ||
| Bid Item | Not set |
Material Information
| Material Type | Hot Mix Asphalt | HMA Type | Type A HMA |
|---|---|---|---|
| HMA Grading | 3/4 inch | Lot number | |
| Sublot number | HMA Mix Number | ||
| Binder content (%) | 0.0 | Virgin binder PG | |
| Design binder PG | Binder Supplier | ||
| RAP content (%) | Not set | WMA Additives | |
| Antistrip type |
Submitted Tests
Sample File Attachments
| File Name | Extension | Date Uploaded | Actions |
|---|---|---|---|
| No results found. | |||
Test File Attachments
DIME Test ID: 2026-09-25-18-1 AASHTO T269-14 (Verified)
