Sample Record

DIME Sample ID 2026-09-08-51

Project Information

Project IdentifiersProject ID: 1002589
DEA: 112N2354
EFIS: 1124000193
DIST-CO-RTE-PM11-SAN DIEGO-76-R8.1/R12.0
Award DateNot set
Closeout DateNot set
Work DescriptionRTE 76 REHAB - OCEANSIDE, 0.4 MI E OF MELROSE DR TO OLIVE HILL RD/CAMINO DEL REY (11-2N2354)
Location DescriptionNot set
QA Service Level1 (Verified on 09/01/2026)

Owner Lab

  • CT D11 - District 11 Materials Laboratory

Sample Information

Sample Taken Date09/08/2026 Sample Unique Key51
Date that the sample was received by the laboratory/organization performing the testing09/09/2026 Sample typeProduction Start-Up
A brief description of the sample3/4" HMA-A The quantity of what the sample constitutes4 Bags
From where was the sample collectedSupplier First name of sampler or witnessed byN/A
Last name of sampler or witnessed byN/A Title of sampler
Telephone number of sampler Laboratory sample identification
Linked DIME Sample ID The fabricator/manufacturer/facility nameAll American Asphalt Corona
Transportation Laboratory (TL) Number Inspector Lot Number from the Transportation Laboratory (TL) Form
Structure unique identifier Structure name
Bid ItemNot set

Material Information

Material TypeAggregate Source Identification (SMARA, name of Pit or Job Site)See mix
The fabricator's/manufacturer's product name for the sample The fabricator/manufacturer designation for the sample
The plant number A detailed description of where the material sample was collectedplant
Where the material sample would have been placed if not sampled Primary Aggregate Nominal Size3/4 inch
The concrete mix design number105793 Lot number
Sublot number Aggregate Mix Number

Submitted Tests

DIME Test IDTest MethodTester Name, Testing LabDate TestedDate AddedVerified?Release DateTest CommentsPrivacy LevelActions
No results found.

Sample File Attachments

File NameExtensionDate UploadedActions
No results found.

Test File Attachments