Sample Record
DIME Sample ID 2026-09-15-65
Project Information
| Project Identifiers | Project ID: 1000510 DEA: 060W79U4 EFIS: 0622000189 |
|---|---|
| DIST-CO-RTE-PM | 06-KER,TUL-99-56.4/57.6,0.0/13.5 |
| Award Date | 04/10/2025 |
| Closeout Date | Not set |
| Work Description | RDWY EXC, HMA, AGGREGATE BASE, CRCP, SIGN STR, AND STR EXC. |
| Location Description | KERN AND TULARE COUNTIES IN AND NEAR DELANO FROM 0.2 MILE SOUTH OF CECIL AVENUE OVERCROSSING TO 0.7 MILE NORTH OF AVENUE 100 OVERCROSSING |
| QA Service Level | 1 (Verified on 08/26/2024) |
Owner Lab
- CT D06 - Bakersfield Field Laboratory
Sample Information
| Sample Taken Date | 09/15/2026 | Sample Unique Key | 65 |
|---|---|---|---|
| Date that the sample was received by the laboratory/organization performing the testing | 09/16/2026 | Sample type | Acceptance |
| A brief description of the sample | CRCP | The quantity of what the sample constitutes | 9 beams and 12 cylinder |
| From where was the sample collected | Source | First name of sampler or witnessed by | Neale |
| Last name of sampler or witnessed by | Brown | Title of sampler | |
| Telephone number of sampler | Laboratory sample identification | ||
| Linked DIME Sample ID | The fabricator/manufacturer/facility name | onsite plant SPCI | |
| Transportation Laboratory (TL) Number | Inspector Lot Number from the Transportation Laboratory (TL) Form | ||
| Structure unique identifier | Structure name | ||
| Bid Item | 56 - CONTINUOUSLY REINFORCED CONCRETE PAVEMENT |
Material Information
| Material Type | Concrete | The concrete mix design number | G3-26-PCC-400 |
|---|---|---|---|
| The truck number from where the sample was collected | The batch plant ticket number from where the sample was collected | 40 | |
| Concrete batch plant | The fabricator/manufacturer designation for the sample | ||
| A detailed description of where the material sample was collected | with loader | Where the material sample would have been placed if not sampled | |
| From Lot No. | Bag Lot No. |
Submitted Tests
Sample File Attachments
| File Name | Extension | Date Uploaded | Actions |
|---|---|---|---|
| No results found. | |||
Test File Attachments
DIME Test ID: 2026-09-15-65-1 CTM 523-May 2020 (Verified)
| File Name | Extension | Date Uploaded | Test ID | Actions |
|---|---|---|---|---|
| 06-0W79U4_37056_260915_7D_3 | 09/22/2026 | 2026-09-15-65-1 | Info |
DIME Test ID: 2026-09-15-65-2 CTM 521-June 2020 (Verified)
| File Name | Extension | Date Uploaded | Test ID | Actions |
|---|---|---|---|---|
| 06-0W79U4_37056_260915_7D_fieldCylinder | 09/22/2026 | 2026-09-15-65-2 | Info |