Sample Record
DIME Sample ID 2026-08-28-9
Project Information
| Project Identifiers | Project ID: 1001123 DEA: 051H4704 EFIS: 0516000078 |
|---|---|
| DIST-CO-RTE-PM | 05-SCR-9-9-13.6,15.5 |
| Award Date | 09/05/2025 |
| Closeout Date | Not set |
| Work Description | REPLACE BRIDGES AND INSTALL MGS. |
| Location Description | SANTA CRUZ COUNTY NEAR BOULDER CREEK AT SAN LORENZO RIVER BRIDGE AND AT KINGS CREEK BRIDGE |
| QA Service Level | 1 (Verified on 04/10/2025) |
Owner Labs
- CT HQ - QASI Bay Area Field Office
- CT HQ - FFS - Field Investigation Team (FIT)
- CT HQ - FFS - Skid Testing
Sample Information
| Sample Taken Date | 08/28/2026 | Sample Unique Key | 9 |
|---|---|---|---|
| Date that the sample was received by the laboratory/organization performing the testing | 09/02/2026 | Sample type | Acceptance |
| A brief description of the sample | Skid Testing Request | The quantity of what the sample constitutes | BRIDGE DECK |
| From where was the sample collected | Job Site | First name of sampler or witnessed by | Jarred |
| Last name of sampler or witnessed by | Burrows | Title of sampler | |
| Telephone number of sampler | Laboratory sample identification | ||
| Linked DIME Sample ID | The fabricator/manufacturer/facility name | Gordon Ball Construction | |
| Transportation Laboratory (TL) Number | Inspector Lot Number from the Transportation Laboratory (TL) Form | ||
| Structure unique identifier | 36-0054 | Structure name | Kings Creek Bridge |
| Bid Item | Not set |
Material Information
| Material Type | Roadway/Bridge Surface | Pavement Surface Type | PCC (Portland Cement Concrete) |
|---|---|---|---|
| Type of Traffic Control Provided | Stationary Lane Closure | DIST-CO-RTE | 5-SCr-009 |
| Direction of Travel | Post Mile | 15.50 | |
| Lanes to be Tested | Station |
Submitted Tests
Sample File Attachments
| File Name | Extension | Date Uploaded | Actions |
|---|---|---|---|
| No results found. | |||
Test File Attachments
DIME Test ID: 2026-08-28-9-2 CTM 342-August 2012 (Verified)
