Sample Record
DIME Sample ID 2018-05-07-1
Project Information
| Project Identifiers | Project ID: 211848 DEA: 112T2174 EFIS: 1116000131 |
|---|---|
| DIST-CO-RTE-PM | 11-SD-5-R37.4 - R46.5 |
| Award Date | 12/22/2016 |
| Closeout Date | 05/01/2026 |
| Work Description | (Alternative Delivery) CMGC, San Elijo Highway Bridge Replacement. Replace the San Elijo lagoon highway bridge, construct HOV lanes, construct bike and pedestrian trails and bridge, build multi-use facility at Manchester Ave. |
| Location Description | IN SAN DIEGO COUNTY IN SOLANA BEACH AND ENCINITAS FROM 0.1 MILE NORTH OF LOMAS SANTA FE DRIVE OVERCROSSING TO 0.2 MILE SOUTH OF BIRMINGHAM DRIVE OVERCROSSING |
| QA Service Level | 1 (Verified on 01/31/2017) |
Owner Lab
- CT HQ - QASI Los Angeles Field Office
Sample Information
| Sample Taken Date | 05/07/2018 | Sample Unique Key | 1 |
|---|---|---|---|
| Date that the sample was received by the laboratory/organization performing the testing | Not set | Sample type | Quality Assurance |
| A brief description of the sample | headed reinforcing bar | The quantity of what the sample constitutes | 150 |
| From where was the sample collected | Fabricator | First name of sampler or witnessed by | Edward |
| Last name of sampler or witnessed by | Trasoras | Title of sampler | Asst METS Rep |
| Telephone number of sampler | 323-594-6208 | Laboratory sample identification | |
| Linked DIME Sample ID | The fabricator/manufacturer/facility name | Headed Reinforcement Corp, Fountain Valley, CA | |
| Transportation Laboratory (TL) Number | Inspector Lot Number from the Transportation Laboratory (TL) Form | ||
| Structure unique identifier | Not set | Structure name | Not set |
| Bid Item | Not set |
Material Information
| Material Type | SMTL TM5 - Headed Bars | Production or Authorization Testing | Production Testing |
|---|---|---|---|
| Rebar Heat Number(s) | xxxx | Head Manufacturer Lot Number(s) | 1 |
| Rebar Size | 18 | Headed Bar Model Name | Headed Reinforcement |
| Size of Head | Full Size - 9x | Head Connection Type | Forged |
| Head Shape | Circular | Rebar Manufacturer | xxx |
| Head Manufacturer | HRC | Head Fabricator | HRC Fountain Valley |
| Material Standard Code | ASTM A955 | Headed Bar Unique ID | Not set |
Submitted Tests
| DIME Test ID | Test Method | Tester Name, Testing Lab | Date Tested | Date Added | Verified? | Release Date | Test Comments | Privacy Level | Actions |
|---|---|---|---|---|---|---|---|---|---|
| No results found. | |||||||||
Sample File Attachments
| File Name | Extension | Date Uploaded | Actions |
|---|---|---|---|
| No results found. | |||
