Sample Record

Owner Lab

  • CT HQ - Sacramento Asphalt Binder Laboratory

DIME Sample ID 2026-08-13-38

Project Information

Project IdentifiersProject ID: 1002407
DEA: 061H9304
EFIS: 0625000101
DIST-CO-RTE-PM06-KER-5-40.0/42.9, 52.8/62.6
Award DateNot set
Closeout DateNot set
Work DescriptionI-5 BUTTONWILLOW PAVEMENT REHAB (PM 40.0/42.9, 52.8/62.6): COLD PLANE, RHMA-G (BWC), HMA (TYPE A), PANEL REPLACEMENT, SHOULDER BACKING, RUMBLE STRIP, THERMO STRIPING, SIGNS, MODIFY TMS
Location DescriptionCONSTRUCTION ON STATE HIGHWAY IN KERN COUNTY IN AND NEAR BUTTONWILLOW FROM 1.2 MILES SOUTH OF ROUTE 5/43 SEPARATION TO 0.1 MILE SOUTH OF KERN RIVER UTILITY ROAD OVERCROSING AND FROM 0.7 MILE NORTH OF ROUTE 5/58 SEPARATION TO LERDO AVENUE OVERCROSING
QA Service Level1 (Verified on 07/13/2026)

Sample Information

Sample Taken Date08/13/2026 Sample Unique Key38
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing08/17/2026
Sample typeQuality Assurance A brief description of the sample64-16
The quantity of what the sample constitutes1 can of 64-16 From where was the sample collectedSource
First name of sampler or witnessed byGRANITE Last name of sampler or witnessed byN/A
Title of samplerQC Telephone number of sampler
Laboratory sample identification Linked DIME Sample ID
The fabricator/manufacturer/facility nameGranite Solari Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form753847 Structure unique identifier
Structure name Bid ItemNot set

Material Information

Material TypeAsphalt Binder Performance GradePG 64-16
Modified Lot number
Sublot number Tank number
Time of sample HMA SupplierGRANITE SOLARI
Certified Asphalt SupplierSan Joaquin Refinery - Bakersfield CA MultigradeNo
Multigrade Type Asphalt Binder Mix Number
HMA Type3/4" HMA-A R25 HMA Supplier Mix ID NumberNOT ON TL 101

Submitted Tests

DIME Test IDTest MethodTester Name, Testing LabDate TestedDate AddedVerified?Release DateTest CommentsPrivacy LevelActions
2026-08-13-38-1AASHTO T315-24: Standard Method of Test for Determining the Rheological Properties of Asphalt Binder Using a Dynamic Shear Rheometer (DSR) (Dynamic Shear)Amare Tefera, CT HQ - Sacramento Asphalt Binder Laboratory08/18/202608/18/2026
Yes
08/19/2026OGPublic - Test Data Visible

Sample File Attachments

File NameExtensionDate UploadedActions
2026-08-13-38pdf08/18/2026   Info

Test File Attachments


DIME Test ID: 2026-08-13-38-1 AASHTO T315-24 (Verified)