Sample Record
Owner Lab
- CT D08 - Fontana Southern Regional Laboratory
DIME Sample ID 2018-04-24-30
Sample is locked from editing. info
Project Information
| Project Identifiers | Project ID: 210735 DEA: 071193U4 EFIS: 0713000007 |
|---|---|
| DIST-CO-RTE-PM | 07-LA-10-37.2/42.4 |
| Award Date | 11/16/2015 |
| Closeout Date | 07/11/2022 |
| Work Description | CONSTRUCT HOV LANES, WIDEN BRIDGES, AND REALIGN RAMPS. |
| Location Description | IN LA COUNTY FROM CITRUS STREET IN WEST COVINA TO ROUTE 57 IN POMONA |
| QA Service Level | 1 (Verified on 03/07/2016) |
Sample Information
| Sample Taken Date | 04/24/2018 | Sample Unique Key | 30 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 04/27/2018 |
| Sample type | Quality Assurance | A brief description of the sample | 6X12 |
| The quantity of what the sample constitutes | 4 | From where was the sample collected | Job Site |
| First name of sampler or witnessed by | THEIN | Last name of sampler or witnessed by | WIN |
| Title of sampler | ASR | Telephone number of sampler | Unknown |
| Laboratory sample identification | 946-8105 | Linked DIME Sample ID | Unknown |
| The fabricator/manufacturer/facility name | READY MIX | Transportation Laboratory (TL) Number | 268105 |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Unknown | Structure unique identifier | HOLT RIGHT SIDE BRIDGE |
| Structure name | HOLT RIGHT SIDE BRIDGE DECK | Bid Item | Not set |
Material Information
| Material Type | Concrete | The concrete mix design number | 3F50X003 |
|---|---|---|---|
| The truck number from where the sample was collected | 633 | The batch plant ticket number from where the sample was collected | 2288779 |
| Concrete batch plant | Unknown | The fabricator/manufacturer designation for the sample | PLANT |
| A detailed description of where the material sample was collected | LOAD 1 | Where the material sample would have been placed if not sampled | HOLT LEFT SIDE BRIDGE |
| From Lot No. | Unknown | Bag Lot No. | Unknown |
Submitted Tests
Sample File Attachments
| File Name | Extension | Date Uploaded | Actions |
|---|---|---|---|
| No results found. | |||
Test File Attachments
DIME Test ID: 2018-04-24-30-1 ASTM C39-17a (Verified)
DIME Test ID: 2018-04-24-30-2 ASTM C39-17a (Verified)
