Sample Record
DIME Sample ID 2026-08-10-3
Project Information
| Project Identifiers | Project ID: 213918 DEA: 063HT014 EFIS: 0615000116 |
|---|---|
| DIST-CO-RTE-PM | 06--- |
| Award Date | Not set |
| Closeout Date | Not set |
| Work Description | (Alternative Delivery) |
| Location Description | Not set |
| QA Service Level | 2 (Verified on 02/04/2019) |
Owner Labs
- S2 Engineering
- California High Speed Rail Authority - Selma
- CT HQ - FFS - Skid Testing
Sample Information
| Sample Taken Date | 08/10/2026 | Sample Unique Key | 3 |
|---|---|---|---|
| Date that the sample was received by the laboratory/organization performing the testing | 08/10/2026 | Sample type | Quality Assurance |
| A brief description of the sample | Portable Skid Testing | The quantity of what the sample constitutes | 1 |
| From where was the sample collected | Job Site | First name of sampler or witnessed by | Don |
| Last name of sampler or witnessed by | Ctibor | Title of sampler | Skid Test |
| Telephone number of sampler | 559-939-7402 | Laboratory sample identification | |
| Linked DIME Sample ID | The fabricator/manufacturer/facility name | AT THE JOB SITE | |
| Transportation Laboratory (TL) Number | Inspector Lot Number from the Transportation Laboratory (TL) Form | ||
| Structure unique identifier | 45-0106 | Structure name | IL#8 SR43 OC North of Nevada |
| Bid Item | 0 |
Sample Location
Latitude 36.160153 Longitude -119.600767 Open in Google Maps
Material Information
| Material Type | Roadway/Bridge Surface | Pavement Surface Type | PCC (Portland Cement Concrete) |
|---|---|---|---|
| Type of Traffic Control Provided | Behind K-Rail/Barrier | DIST-CO-RTE | |
| Direction of Travel | Post Mile | 6.81 | |
| Lanes to be Tested | Lane #1,Lane #2 | Station |
Submitted Tests
Sample File Attachments
| File Name | Extension | Date Uploaded | Actions |
|---|---|---|---|
| No results found. | |||
Test File Attachments
DIME Test ID: 2026-08-10-3-1 CTM 342-August 2012 (Verified)
