Sample Record
DIME Sample ID 2026-03-30-66
Project Information
| Project Identifiers | Project ID: 1001985 DEA: 010L9904 EFIS: 0122000073 |
|---|---|
| DIST-CO-RTE-PM | 01-DN-199-T0.6/0.8 |
| Award Date | 01/30/2026 |
| Closeout Date | Not set |
| Work Description | DN 199 Construct Roundabout |
| Location Description | Not set |
| QA Service Level | 1 (Verified on 03/04/2026) |
Owner Labs
- G3 Quality, Incorporated - Cerritos
- Pavement Engineers
Sample Information
| Sample Taken Date | 03/30/2026 | Sample Unique Key | 66 |
|---|---|---|---|
| Date that the sample was received by the laboratory/organization performing the testing | 04/01/2026 | Sample type | Quality Control |
| A brief description of the sample | TWC-CT675PAV | The quantity of what the sample constitutes | NA |
| From where was the sample collected | Other | First name of sampler or witnessed by | R |
| Last name of sampler or witnessed by | Davenport | Title of sampler | |
| Telephone number of sampler | Laboratory sample identification | ||
| Linked DIME Sample ID | The fabricator/manufacturer/facility name | Twining | |
| Transportation Laboratory (TL) Number | Inspector Lot Number from the Transportation Laboratory (TL) Form | ||
| Structure unique identifier | Structure name | ||
| Bid Item | Not set |
Material Information
| Material Type | Concrete | The concrete mix design number | TWC-CT675PAV |
|---|---|---|---|
| The truck number from where the sample was collected | The batch plant ticket number from where the sample was collected | NA | |
| Concrete batch plant | The fabricator/manufacturer designation for the sample | ||
| A detailed description of where the material sample was collected | NA | Where the material sample would have been placed if not sampled | |
| From Lot No. | Bag Lot No. |
Submitted Tests
Sample File Attachments
| File Name | Extension | Date Uploaded | Actions |
|---|---|---|---|
| No results found. | |||
Test File Attachments
DIME Test ID: 2026-03-30-66-1 AASHTO T336-15 (Verified)
