Sample Record
DIME Sample ID 2026-07-17-16
Project Information
| Project Identifiers | Project ID: 994751 DEA: 010C5004 EFIS: 0112000292 |
|---|---|
| DIST-CO-RTE-PM | 01-HUM-36-11.3/34.6 |
| Award Date | 03/02/2023 |
| Closeout Date | Not set |
| Work Description | Project Name: Bridge Rail Replacement - 3 Bridges |
| Location Description | Hely Creek, Little Larabee Creek and Butte Creek Bridge. |
| QA Service Level | 1 (Verified on 04/27/2023) |
Owner Lab
- CT D01 - District 1 Materials Laboratory
Sample Information
| Sample Taken Date | 07/17/2026 | Sample Unique Key | 16 |
|---|---|---|---|
| Date that the sample was received by the laboratory/organization performing the testing | Not set | Sample type | Quality Assurance |
| A brief description of the sample | Polyester Concrete Overlay | The quantity of what the sample constitutes | 625 CF |
| From where was the sample collected | Source | First name of sampler or witnessed by | Jessie |
| Last name of sampler or witnessed by | Lee | Title of sampler | |
| Telephone number of sampler | Laboratory sample identification | ||
| Linked DIME Sample ID | The fabricator/manufacturer/facility name | kwik | |
| Transportation Laboratory (TL) Number | Inspector Lot Number from the Transportation Laboratory (TL) Form | ||
| Structure unique identifier | Structure name | ||
| Bid Item | Not set |
Material Information
| Material Type | Roadway/Bridge Surface | Pavement Surface Type | Polyester Concrete |
|---|---|---|---|
| Type of Traffic Control Provided | N/A | DIST-CO-RTE | 01-HUM-36 |
| Direction of Travel | Post Mile | 22.00 | |
| Lanes to be Tested | Lane #1 | Station |
Submitted Tests
| DIME Test ID | Test Method | Tester Name, Testing Lab | Date Tested | Date Added | Verified? | Release Date | Test Comments | Privacy Level | Actions |
|---|---|---|---|---|---|---|---|---|---|
| No results found. | |||||||||
Sample File Attachments
| File Name | Extension | Date Uploaded | Actions |
|---|---|---|---|
| No results found. | |||
