Sample Record

Owner Lab

  • G3 Quality, Incorporated - Cerritos

DIME Sample ID 2026-05-13-71

Project Information

Project IdentifiersProject ID: 1001666
DEA: 051K4404
EFIS: 0518000208
DIST-CO-RTE-PM05-MON,-101-R41.9/49.8
Award DateNot set
Closeout DateNot set
Work DescriptionCOLD PLANE, PLACE HMA & RHMA, LIGHTING AND INSTALL TMS ELEMENTS.
Location DescriptionMONTEREY COUNTY NEAR KING CITY FROM JOLON ROAD UNDERCROSSING TO 0.1 MILE NORTH OF LAGOMARSINO AVENUE
QA Service Level1 (Verified on 10/16/2025)

Sample Information

Sample Taken Date05/13/2026 Sample Unique Key71
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing05/13/2026
Sample typeQuality Control A brief description of the sample4x8 Cylinders
The quantity of what the sample constitutes5 From where was the sample collectedJob Site
First name of sampler or witnessed byBrenda Last name of sampler or witnessed byAmaya
Title of samplerField Technician Telephone number of sampler
Laboratory sample identification077720 Set 1 Linked DIME Sample ID
The fabricator/manufacturer/facility nameGraniterock Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure nameCIDH Piles 22-31 Bid ItemNot set

Material Information

Material TypeConcrete The concrete mix design number077720
The truck number from where the sample was collectedLoad 1 The batch plant ticket number from where the sample was collected0
Concrete batch plantGraniterock The fabricator/manufacturer designation for the sampleSet 1
A detailed description of where the material sample was collectedCIDH Piles 22-31 Where the material sample would have been placed if not sampled
From Lot No.1 Bag Lot No.1

Submitted Tests

DIME Test IDTest MethodTester Name, Testing LabDate TestedDate AddedVerified?Release DateTest CommentsPrivacy LevelActions
2026-05-13-71-1CTM 557-June 2020: Method of Test for Temperature of Freshly Mixed Hydraulic Cement ConcreteBrenda Amaya, G3 Quality, Incorporated - Cerritos05/13/202607/10/2026
No
 
2026-05-13-71-2CTM 518-June 2010: Method of Test for Unit Weight of Fresh ConcreteBrenda Amaya, G3 Quality, Incorporated - Cerritos05/13/202607/10/2026
No
 
2026-05-13-71-3CTM 504-June 2010: Method of Test for Determining Air Content of Freshly Mixed Concrete by the Pressure MethodBrenda Amaya, G3 Quality, Incorporated - Cerritos05/13/202607/10/2026
No
 
2026-05-13-71-4CTM 556-January 2018: Method of Test for Slump of Fresh Portland Cement ConcreteBrenda Amaya, G3 Quality, Incorporated - Cerritos05/13/202607/10/2026
No
 
2026-05-13-71-5CTM 521-June 2020: Method of Test for Compressive Strength of Molded Concrete CylindersDavid Silva, G3 Quality, Incorporated - Cerritos05/20/202607/10/2026
No
 
2026-05-13-71-6CTM 521-June 2020: Method of Test for Compressive Strength of Molded Concrete CylindersMichael Kaus, G3 Quality, Incorporated - Cerritos06/10/202607/10/2026
No
 

Sample File Attachments

File NameExtensionDate UploadedActions
No results found.

Test File Attachments


DIME Test ID: 2026-05-13-71-1 CTM 557-June 2020
DIME Test ID: 2026-05-13-71-2 CTM 518-June 2010
DIME Test ID: 2026-05-13-71-3 CTM 504-June 2010
DIME Test ID: 2026-05-13-71-4 CTM 556-January 2018
DIME Test ID: 2026-05-13-71-5 CTM 521-June 2020
DIME Test ID: 2026-05-13-71-6 CTM 521-June 2020