Sample Record

Owner Lab

  • G3 Quality, Incorporated - Cerritos

DIME Sample ID 2026-07-01-46

Sample is locked from editing. info

Project Information

Project IdentifiersProject ID: 212900
DEA: 051G6804
EFIS: 0515000063
DIST-CO-RTE-PM05-SLO-101-16.2-20.3
Award DateNot set
Closeout DateNot set
Work DescriptionUS 101 PISMO CONGESTION RELIEF PROJECT
Location DescriptionIN SAN LUIS OBISPO COUNTY IN PSMO BEACH FROM PISMO OVERHEAD TO 0.5 MILE NORTH OF SHELL BEACH ROAD UC
QA Service Level1 (Verified on 09/30/2019)

Sample Information

Sample Taken Date07/01/2026 Sample Unique Key46
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing07/02/2026
Sample typeQuality Control A brief description of the sample4x8 cylinders
The quantity of what the sample constitutes5 From where was the sample collectedJob Site
First name of sampler or witnessed byAlvaro Last name of sampler or witnessed byPineda
Title of samplerField Technician Telephone number of sampler
Laboratory sample identificationES26-032, Set 2 Linked DIME Sample ID
The fabricator/manufacturer/facility nameAlliance Ready Mix Arroyo Grande Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure nameFooting STA 18+50 Bid ItemNot set

Material Information

Material TypeConcrete The concrete mix design numberES26-032
The truck number from where the sample was collectedLoad 12 The batch plant ticket number from where the sample was collected1
Concrete batch plant The fabricator/manufacturer designation for the sampleSet 2
A detailed description of where the material sample was collectedFooting STA 18+50 Where the material sample would have been placed if not sampled
From Lot No.1 Bag Lot No.1

Submitted Tests

DIME Test IDTest MethodTester Name, Testing LabDate TestedDate AddedVerified?Release DateTest CommentsPrivacy LevelActions
2026-07-01-46-1CTM 518-June 2010: Method of Test for Unit Weight of Fresh ConcreteAlvaro Pineda, G3 Quality, Incorporated - Cerritos07/01/202607/08/2026
Yes
07/29/2026 
2026-07-01-46-2CTM 504-June 2010: Method of Test for Determining Air Content of Freshly Mixed Concrete by the Pressure MethodAlvaro Pineda, G3 Quality, Incorporated - Cerritos07/01/202607/08/2026
Yes
07/29/2026 
2026-07-01-46-3CTM 556-January 2018: Method of Test for Slump of Fresh Portland Cement ConcreteAlvaro Pineda, G3 Quality, Incorporated - Cerritos07/01/202607/08/2026
Yes
07/29/2026 
2026-07-01-46-4CTM 557-June 2020: Method of Test for Temperature of Freshly Mixed Hydraulic Cement ConcreteAlvaro Pineda, G3 Quality, Incorporated - Cerritos07/01/202607/08/2026
Yes
07/29/2026 
2026-07-01-46-5CTM 521-June 2020: Method of Test for Compressive Strength of Molded Concrete CylindersMichael Kaus, G3 Quality, Incorporated - Cerritos07/08/202607/08/2026
Yes
07/29/2026 
2026-07-01-46-6CTM 521-June 2020: Method of Test for Compressive Strength of Molded Concrete CylindersMichael Kaus, G3 Quality, Incorporated - Cerritos07/29/202607/29/2026
Yes
07/29/2026 

Sample File Attachments

File NameExtensionDate UploadedActions
No results found.

Test File Attachments


DIME Test ID: 2026-07-01-46-1 CTM 518-June 2010 (Verified)
DIME Test ID: 2026-07-01-46-2 CTM 504-June 2010 (Verified)
DIME Test ID: 2026-07-01-46-3 CTM 556-January 2018 (Verified)
DIME Test ID: 2026-07-01-46-4 CTM 557-June 2020 (Verified)
DIME Test ID: 2026-07-01-46-5 CTM 521-June 2020 (Verified)
DIME Test ID: 2026-07-01-46-6 CTM 521-June 2020 (Verified)