Sample Record

Owner Labs

  • CT D06 - Millbrook Field Laboratory
  • CT HQ - FFS - Skid Testing

DIME Sample ID 2026-07-06-8

Project Information

Project IdentifiersProject ID: 1001902
DEA: 061H6704
EFIS: 0625000240
DIST-CO-RTE-PM06-TUL-190-26.65
Award Date06/26/2025
Closeout DateNot set
Work DescriptionReplace exiting bridge rail on EB direction of SR 190, demo and reconstruct overhang, remove existing AC overlay, deck overhang strengthening at bridge rail, poly conc overlay, install new ST-75 barrier rail.
Location DescriptionTule River Bridge (BR #46-0187).
QA Service Level1 (Verified on 01/08/2026)

Sample Information

Sample Taken Date07/06/2026 Sample Unique Key8
Will the laboratory/organization for which you are a member perform testing on this material sample?No Date that the sample was received by the laboratory/organization performing the testing07/06/2026
Sample typeAcceptance A brief description of the sampleSkid Testing Request
The quantity of what the sample constitutesMultiple Lanes From where was the sample collectedJob Site
First name of sampler or witnessed byAdam Last name of sampler or witnessed byMahmoud
Title of sampler Telephone number of sampler
Laboratory sample identification Linked DIME Sample ID
The fabricator/manufacturer/facility nameDBE Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier46-0187
Structure nameTule River Bridge Bid ItemNot set

Material Information

Material TypeRoadway/Bridge Surface Pavement Surface TypePCC (Portland Cement Concrete)
Type of Traffic Control ProvidedStationary Lane Closure DIST-CO-RTE06-tul-190
Direction of TravelEast Post Mile26.60
Lanes to be TestedLane #1 Station

Submitted Tests

DIME Test IDTest MethodTester Name, Testing LabDate TestedDate AddedVerified?Release DateTest CommentsPrivacy LevelActions
2026-07-06-8-1CTM 342-August 2012: Method of Test for Surface Skid Resistance with the California Portable Skid Tester (Skid)HARISH THAKUR, CT HQ - FFS - Skid Testing07/13/202607/15/2026
Yes
07/15/2026TULE RIVER BRIDGE #46-0187 ENTIRE BRIDGE VISUALLY INSPECTED AND ALL LOOKED UNIFORMED.Public - Test Data Visible

Sample File Attachments

File NameExtensionDate UploadedActions
No results found.

Test File Attachments


DIME Test ID: 2026-07-06-8-1 CTM 342-August 2012 (Verified)