Sample Record
Owner Lab
- RMA Group - Rancho Cordova
DIME Sample ID 2026-05-29-62
Project Information
| Project Identifiers | Project ID: 1001123 DEA: 051H4704 EFIS: 0516000078 |
|---|---|
| DIST-CO-RTE-PM | 05-SCR-9-9-13.6,15.5 |
| Award Date | 09/05/2025 |
| Closeout Date | Not set |
| Work Description | REPLACE BRIDGES AND INSTALL MGS. |
| Location Description | SANTA CRUZ COUNTY NEAR BOULDER CREEK AT SAN LORENZO RIVER BRIDGE AND AT KINGS CREEK BRIDGE |
| QA Service Level | 1 (Verified on 04/10/2025) |
Sample Information
| Sample Taken Date | 05/29/2026 | Sample Unique Key | 62 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 05/29/2026 |
| Sample type | Quality Control | A brief description of the sample | Concrete |
| The quantity of what the sample constitutes | 100 cy | From where was the sample collected | Job Site |
| First name of sampler or witnessed by | Arthur | Last name of sampler or witnessed by | Schai |
| Title of sampler | Telephone number of sampler | ||
| Laboratory sample identification | Linked DIME Sample ID | ||
| The fabricator/manufacturer/facility name | Granite Rock | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Concrete | The concrete mix design number | 759W50S |
|---|---|---|---|
| The truck number from where the sample was collected | 117 | The batch plant ticket number from where the sample was collected | 402015 |
| Concrete batch plant | The fabricator/manufacturer designation for the sample | ||
| A detailed description of where the material sample was collected | concrete truck | Where the material sample would have been placed if not sampled | |
| From Lot No. | Bag Lot No. |
Submitted Tests
| DIME Test ID | Test Method | Tester Name, Testing Lab | Date Tested | Date Added | Verified? | Release Date | Test Comments | Privacy Level | Actions |
|---|---|---|---|---|---|---|---|---|---|
| 2026-05-29-62-1 | CTM 518-June 2010: Method of Test for Unit Weight of Fresh Concrete | Arthur Schai, RMA Group - Rancho Cordova | 05/29/2026 | 07/01/2026 | No | ||||
| 2026-05-29-62-2 | ASTM C143-20: Standard Test Method for Slump of Hydraulic-Cement Concrete | Arthur Schai, RMA Group - Rancho Cordova | 05/29/2026 | 07/01/2026 | No | ||||
| 2026-05-29-62-3 | CTM 504-June 2010: Method of Test for Determining Air Content of Freshly Mixed Concrete by the Pressure Method | Arthur Schai, RMA Group - Rancho Cordova | 05/29/2026 | 07/01/2026 | No | ||||
| 2026-05-29-62-4 | CTM 557-June 2020: Method of Test for Temperature of Freshly Mixed Hydraulic Cement Concrete | Arthur Schai, RMA Group - Rancho Cordova | 05/29/2026 | 07/01/2026 | No | ||||
| 2026-05-29-62-5 | CTM 521-June 2020: Method of Test for Compressive Strength of Molded Concrete Cylinders | Todd Strait, RMA Group - Rancho Cordova | 06/26/2026 | 07/01/2026 | No |
Sample File Attachments
| File Name | Extension | Date Uploaded | Actions |
|---|---|---|---|
| No results found. | |||
Test File Attachments
DIME Test ID: 2026-05-29-62-1 CTM 518-June 2010
DIME Test ID: 2026-05-29-62-2 ASTM C143-20
DIME Test ID: 2026-05-29-62-3 CTM 504-June 2010
DIME Test ID: 2026-05-29-62-4 CTM 557-June 2020
DIME Test ID: 2026-05-29-62-5 CTM 521-June 2020