Sample Record
DIME Sample ID 2026-06-25-55
Project Information
| Project Identifiers | Project ID: 1001573 DEA: 060X2904 EFIS: 0618000050 |
|---|---|
| DIST-CO-RTE-PM | 06-FRE-33-13.9/16.7 |
| Award Date | Not set |
| Closeout Date | Not set |
| Work Description | HMA (TYPE A), RDWY EXC, CL 2 AB, CURB RAMPS AND MOBILIZATION. |
| Location Description | FRESNO COUNTY IN AND NEAR COALINGA FROM ENTERPRISE PARKWAY TO LOS GATOS CREEK SOUTH CHANNEL BRIDGE |
| QA Service Level | 1 (Verified on 09/15/2025) |
Owner Lab
- CT HQ - Sacramento Asphalt Binder Laboratory
Sample Information
| Sample Taken Date | 06/25/2026 | Sample Unique Key | 55 |
|---|---|---|---|
| Date that the sample was received by the laboratory/organization performing the testing | 06/29/2026 | Sample type | Quality Assurance |
| A brief description of the sample | ss-1h 70/30 | The quantity of what the sample constitutes | 2 jugs of ss-1h |
| From where was the sample collected | Source | First name of sampler or witnessed by | DIN |
| Last name of sampler or witnessed by | DADAWALLA | Title of sampler | PE |
| Telephone number of sampler | Laboratory sample identification | ||
| Linked DIME Sample ID | The fabricator/manufacturer/facility name | Talley Oil | |
| Transportation Laboratory (TL) Number | Inspector Lot Number from the Transportation Laboratory (TL) Form | 00000 | |
| Structure unique identifier | Structure name | ||
| Bid Item | Not set |
Material Information
| Material Type | Asphaltic Emulsion | Emulsion Grade | SS-1h |
|---|---|---|---|
| Lot Number | Not set | Sub Lot | Not set |
| Dilution Percentage Rate | 70/30 |
Submitted Tests
Sample File Attachments
| File Name | Extension | Date Uploaded | Actions |
|---|---|---|---|
| No results found. | |||
Test File Attachments
DIME Test ID: 2026-06-25-55-1 AASHTO T59-25 (Verified)
