Sample Record
DIME Sample ID 2026-06-24-27
Project Information
| Project Identifiers | Project ID: 1002087 DEA: 043AA904 EFIS: 0420000066 |
|---|---|
| DIST-CO-RTE-PM | 04-MRN-131-1.95 |
| Award Date | Not set |
| Closeout Date | Not set |
| Work Description | 3AA90 INSTALL SOLDIER PILE AND LAGGING WALL, AND RECONSTRUCT - Hwy 131 PM 1.95 |
| Location Description | Not set |
| QA Service Level | 1 (Verified on 04/20/2026) |
Owner Lab
- CT D04 - Richmond Field Laboratory
Sample Information
| Sample Taken Date | 06/24/2026 | Sample Unique Key | 27 |
|---|---|---|---|
| Date that the sample was received by the laboratory/organization performing the testing | 06/24/2026 | Sample type | Quality Assurance |
| A brief description of the sample | Class 2 AB | The quantity of what the sample constitutes | baserock |
| From where was the sample collected | Job Site | First name of sampler or witnessed by | Ignacio |
| Last name of sampler or witnessed by | Arechiga | Title of sampler | |
| Telephone number of sampler | Laboratory sample identification | ||
| Linked DIME Sample ID | The fabricator/manufacturer/facility name | dutra | |
| Transportation Laboratory (TL) Number | Inspector Lot Number from the Transportation Laboratory (TL) Form | ||
| Structure unique identifier | Structure name | ||
| Bid Item | Not set |
Material Information
| Material Type | Soil | The fabricator's/manufacturer's product name for the sample | |
|---|---|---|---|
| The fabricator/manufacturer designation for the sample | A detailed description of where the material sample was collected | jobsite | |
| Where the material sample would have been placed if not sampled |
Submitted Tests
Sample File Attachments
| File Name | Extension | Date Uploaded | Actions |
|---|---|---|---|
| No results found. | |||
Test File Attachments
DIME Test ID: 2026-06-24-27-1 CTM 216-June 2011 (Verified)
DIME Test ID: 2026-06-24-27-2 CTM 231-March 2013 (Verified)
