Sample Record
Owner Lab
- CT D01 - Crescent City Field Laboratory
DIME Sample ID 2026-06-18-7
Project Information
| Project Identifiers | Project ID: 1001370 DEA: 010K9504 EFIS: 0121000034 |
|---|---|
| DIST-CO-RTE-PM | 01-DN-101-15.6/16.2 |
| Award Date | 09/22/2025 |
| Closeout Date | Not set |
| Work Description | PLACE ROADWAY SECTION, INSTALL GUARDRAIL, & EXCAVATE EXISTING ROADWAY. |
| Location Description | DEL NORTE COUNTY ABOUT 10.0 MILES SOUTH OF CRESCENT CITY FROM 3.0 MILES NORTH TO 3.6 MILES NORTH OF WILSON CREEK BRIDGE |
| QA Service Level | 1 (Verified on 07/08/2025) |
Sample Information
| Sample Taken Date | 06/18/2026 | Sample Unique Key | 7 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 06/18/2026 |
| Sample type | Quality Assurance | A brief description of the sample | 3/4- tidewater agg base for roadway |
| The quantity of what the sample constitutes | 150 | From where was the sample collected | Job Site |
| First name of sampler or witnessed by | Lee | Last name of sampler or witnessed by | Renick |
| Title of sampler | Telephone number of sampler | ||
| Laboratory sample identification | Linked DIME Sample ID | ||
| The fabricator/manufacturer/facility name | Tidewater Starry pit | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Aggregate | Source Identification (SMARA, name of Pit or Job Site) | Tidewater Starry Pit |
|---|---|---|---|
| The fabricator's/manufacturer's product name for the sample | The fabricator/manufacturer designation for the sample | ||
| The plant number | A detailed description of where the material sample was collected | in the roadway of 101 NB took compaction test samples from shot sites | |
| Where the material sample would have been placed if not sampled | Primary Aggregate Nominal Size | 3/4 inch | |
| The concrete mix design number | Lot number | ||
| Sublot number | Aggregate Mix Number |
Submitted Tests
| DIME Test ID | Test Method | Tester Name, Testing Lab | Date Tested | Date Added | Verified? | Release Date | Test Comments | Privacy Level | Actions |
|---|---|---|---|---|---|---|---|---|---|
| 2026-06-18-7-1 | CTM 216-June 2011: Method of Test for Relative Compaction of Untreated and Treated Soils and Aggregates | Lee Renick, CT D01 - Crescent City Field Laboratory | 06/19/2026 | 06/19/2026 | No | i applie3d the wrong test to this t101 it was supposed to be for compaction and it meets compaction sorry for the incorrect test sheet |
Sample File Attachments
| File Name | Extension | Date Uploaded | Actions |
|---|---|---|---|
| No results found. | |||
Test File Attachments
DIME Test ID: 2026-06-18-7-1 CTM 216-June 2011
