Sample Record

DIME Sample ID 2026-06-04-100

Project Information

Project IdentifiersProject ID: 1001902
DEA: 061H6704
EFIS: 0625000240
DIST-CO-RTE-PM06-TUL-190-26.65
Award Date06/26/2025
Closeout Date08/31/2026
Work DescriptionReplace exiting bridge rail on EB direction of SR 190, demo and reconstruct overhang, remove existing AC overlay, deck overhang strengthening at bridge rail, poly conc overlay, install new ST-75 barrier rail.
Location DescriptionTule River Bridge (BR #46-0187).
QA Service Level1 (Verified on 01/08/2026)

Owner Lab

  • CT D06 - Millbrook Field Laboratory

Sample Information

Sample Taken Date06/04/2026 Sample Unique Key100
Date that the sample was received by the laboratory/organization performing the testing06/05/2026 Sample typeQuality Assurance
A brief description of the sampleConcrete The quantity of what the sample constitutes18 cy
From where was the sample collectedJob Site First name of sampler or witnessed byAdam
Last name of sampler or witnessed byMahmoud Title of sampler
Telephone number of sampler Laboratory sample identification
Linked DIME Sample ID The fabricator/manufacturer/facility nameCALPORTLAND
Transportation Laboratory (TL) Number Inspector Lot Number from the Transportation Laboratory (TL) Form
Structure unique identifier Structure name
Bid ItemNot set

Material Information

Material TypeConcrete The concrete mix design number163459
The truck number from where the sample was collected The batch plant ticket number from where the sample was collected294948
Concrete batch plant The fabricator/manufacturer designation for the sample
A detailed description of where the material sample was collectedConcrete from wheelbarrow Where the material sample would have been placed if not sampled
From Lot No. Bag Lot No.

Submitted Tests

DIME Test IDTest MethodTester Name, Testing LabDate TestedDate AddedVerified?Release DateTest CommentsPrivacy LevelActions
No results found.

Sample File Attachments

File NameExtensionDate UploadedActions
No results found.

Test File Attachments