Sample Record

DIME Sample ID 2026-05-28-3

Project Information

Project IdentifiersProject ID: 1002169
DEA: 051S3304
EFIS: 0524000215
DIST-CO-RTE-PM05-SB-101-12.3/13.49
Award Date03/25/2026
Closeout DateNot set
Work DescriptionNot set
Location DescriptionNot set
QA Service Level1 (Verified on 04/28/2026)

Owner Labs

  • CT SC - 3675 - Santa Barbara 1
  • CT HQ - FFS - Skid Testing

Sample Information

Sample Taken Date05/28/2026 Sample Unique Key3
Date that the sample was received by the laboratory/organization performing the testing05/28/2026 Sample typeAcceptance
A brief description of the sampleSkid Testing Request The quantity of what the sample constitutesTrial Slab and Multiple Lanes
From where was the sample collectedJob Site First name of sampler or witnessed byRaymond
Last name of sampler or witnessed byBarajas Title of samplerRaymond Barajas
Telephone number of sampler805-441-6932 Laboratory sample identification
Linked DIME Sample ID The fabricator/manufacturer/facility nameVelarde Concrete Construction
Transportation Laboratory (TL) Number Inspector Lot Number from the Transportation Laboratory (TL) Form
Structure unique identifier51-0332 Structure nameSycamore Creek
Bid Item20 - FURNISH BRIDGE DECK TREATMENT MATERIAL

Material Information

Material TypeRoadway/Bridge Surface Pavement Surface TypePCC (Portland Cement Concrete)
Type of Traffic Control ProvidedStationary Lane Closure DIST-CO-RTE05-SB-101
Direction of TravelSouth Post Mile12.30
Lanes to be TestedShoulder Station

Submitted Tests

DIME Test IDTest MethodTester Name, Testing LabDate TestedDate AddedVerified?Release DateTest CommentsPrivacy LevelActions
2026-05-28-3-1CTM 342-August 2012: Method of Test for Surface Skid Resistance with the California Portable Skid Tester (Skid)HARISH THAKUR, CT HQ - FFS - Skid Testing06/05/202606/07/2026
Yes
06/07/2026VISUALLY INSPECTED ENTIRE BRIDGE, ALL LOOKS UNIFORMED. TESTED APPROACH SLAB WHICH ALSO COMPLIES-.35-.30-.40=.35 AVGPublic - Test Data Visible
2026-05-28-3-2CTM 342-August 2012: Method of Test for Surface Skid Resistance with the California Portable Skid Tester (Skid)HARISH THAKUR, CT HQ - FFS - Skid Testing07/22/202607/23/2026
Yes
08/04/2026BRIDGE # 51-0335 VISUALLY INSPECTED SYCAMORE BRIDGE/MILPAS BRIDGE. EVERYTHING LOOKED UNIFORMED AND JUST LIKE THIS BRIDGE. THIS BRIDGE USED AS TRIAL SLAB FOR THE BRIDGES GOING NBPublic - Test Data Visible
2026-05-28-3-3CTM 342-August 2012: Method of Test for Surface Skid Resistance with the California Portable Skid Tester (Skid)HARISH THAKUR, CT HQ - FFS - Skid Testing07/22/202607/23/2026
Yes
08/04/2026GARDEN BRIDGE THIS BRIDGE USED AS TRIAL SLAB FOR BRIDGES- MILPAS ST/SYCAMORE/BR #51-0335. VISUALLY INSPECTED EACH BRIDGE AND ALL LOOKED UNIFORMED AND JUST AS GOOD AS THIS BRIDGEPublic - Test Data Visible

Sample File Attachments

File NameExtensionDate UploadedActions
No results found.

Test File Attachments


DIME Test ID: 2026-05-28-3-1 CTM 342-August 2012 (Verified)
DIME Test ID: 2026-05-28-3-2 CTM 342-August 2012 (Verified)
DIME Test ID: 2026-05-28-3-3 CTM 342-August 2012 (Verified)