Sample Record
Owner Lab
- CT HQ - Sacramento Structural Materials Testing Laboratory
DIME Sample ID 2026-05-01-54
Project Information
| Project Identifiers | Project ID: 1000710 DEA: 100P9244 EFIS: 1023000226 |
|---|---|
| DIST-CO-RTE-PM | 10-MPA-140-42.0/42.7 |
| Award Date | 08/22/2025 |
| Closeout Date | Not set |
| Work Description | Fergusen Slide Rock Avalanche Shed |
| Location Description | Mariposa County, along Route 140 in the Merced River canyon, about 8 miles east of Briceburg and 7.6 miles west of El Portal. |
| QA Service Level | 1 (Verified on 10/15/2024) |
Sample Information
| Sample Taken Date | 05/01/2026 | Sample Unique Key | 54 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | No | Date that the sample was received by the laboratory/organization performing the testing | 05/18/2026 |
| Sample type | Quality Assurance | A brief description of the sample | #10 Coupler Dayton D340 |
| The quantity of what the sample constitutes | 8 | From where was the sample collected | Manufacturer |
| First name of sampler or witnessed by | Alexis | Last name of sampler or witnessed by | Hernandez |
| Title of sampler | Telephone number of sampler | ||
| Laboratory sample identification | Linked DIME Sample ID | ||
| The fabricator/manufacturer/facility name | Dayton Superior | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | SMTL TM5 - Couplers | Production or Authorization Testing | Production Testing |
|---|---|---|---|
| Service or Ultimate | Service | Material Standard Code | ASTM A706 |
| Material Grade | 80 | Rebar Manufacturer | Nucor |
| Coupler Manufacturer | Dayton Superior | Intermediate Assembler or Fabricator | |
| Rebar Size | #10 | Coupler Model | Dayton D340 |
| Coating Standards | Uncoated | Shape of Rebar | Straight |
| Rebar Hoop Diameter | Rebar Hoop Fabricator | ||
| Coupler Component Heat/Lot Number(s) | 6569 | Rebar Heat Number(s) | 3500036042 |
| Rebar Size 2 | Coupler Unique ID | ST-17-13 |
Submitted Tests
| DIME Test ID | Test Method | Tester Name, Testing Lab | Date Tested | Date Added | Verified? | Release Date | Test Comments | Privacy Level | Actions |
|---|---|---|---|---|---|---|---|---|---|
| 2026-05-01-54-1 | CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile Slip) | Andrew Auvinen, CT HQ - Sacramento Structural Materials Testing Laboratory | 06/01/2026 | 06/01/2026 | No | ||||
| 2026-05-01-54-2 | CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile Slip) | Andrew Auvinen, CT HQ - Sacramento Structural Materials Testing Laboratory | 06/01/2026 | 06/01/2026 | No | ||||
| 2026-05-01-54-3 | CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile Slip) | Andrew Auvinen, CT HQ - Sacramento Structural Materials Testing Laboratory | 06/01/2026 | 06/01/2026 | No |
Test File Attachments
DIME Test ID: 2026-05-01-54-1 CTM 670-December 2013
DIME Test ID: 2026-05-01-54-2 CTM 670-December 2013
DIME Test ID: 2026-05-01-54-3 CTM 670-December 2013
