Sample Record

DIME Sample ID 2026-04-28-9

Sample is locked from editing. info

Project Information

Project IdentifiersProject ID: 1001571
DEA: 051Q1604
EFIS: 0522000177
DIST-CO-RTE-PM05-MON-1-60.0
Award DateNot set
Closeout DateNot set
Work DescriptionELECTROCHEMICAL CHLORIDE EXTRACTION (ECE) OF BRIDGE STRUCTURE.
Location DescriptionMONTEREY COUNTY NEAR BIG SUR AT ROCKY CREEK BRIDGE
QA Service Level1 (Verified on 09/08/2025)

Owner Lab

  • CT D05 - Monterey Construction Field Laboratory

Sample Information

Sample Taken Date04/28/2026 Sample Unique Key9
Date that the sample was received by the laboratory/organization performing the testing04/28/2026 Sample typeQuality Assurance
A brief description of the sampleSpall Repair Filler The quantity of what the sample constitutesSpall Repair Trial
From where was the sample collectedJob Site First name of sampler or witnessed byJoseph
Last name of sampler or witnessed byEsteybar Title of sampler
Telephone number of sampler Laboratory sample identification
Linked DIME Sample ID The fabricator/manufacturer/facility nameACC West Coast
Transportation Laboratory (TL) Number Inspector Lot Number from the Transportation Laboratory (TL) Form
Structure unique identifier Structure name
Bid ItemNot set

Material Information

Material TypeRapid Set ManufacturerCTS
Mix no.18 Materials Receivedna
Lot no.na Batch Numberna

Submitted Tests

DIME Test IDTest MethodTester Name, Testing LabDate TestedDate AddedVerified?Release DateTest CommentsPrivacy LevelActions
2026-04-28-9-2FFS 1-23: Field Investigation Report (FIR)Joseph Esteybar, CT D05 - Monterey Construction Field Laboratory04/28/202605/27/2026
Yes
05/27/20261 set of 3 4x8 cylinders to be broken at 3 hour mark.Public - Test Data Visible
2026-04-28-9-3FFS 1-23: Field Investigation Report (FIR)Joseph Esteybar, CT D05 - Monterey Construction Field Laboratory04/29/202605/27/2026
Yes
05/27/20261 set of 3 4x8 cylinders to be broken at 24 hour markPublic - Test Data Visible
2026-04-28-9-4FFS 1-23: Field Investigation Report (FIR)Joseph Esteybar, CT D05 - Monterey Construction Field Laboratory04/30/202605/27/2026
Yes
05/27/20261 set of 3 4x8 cylinders to be broken at 48 hour mark.Public - Test Data Visible
2026-04-28-9-5FFS 1-23: Field Investigation Report (FIR)Joseph Esteybar, CT D05 - Monterey Construction Field Laboratory05/26/202605/27/2026
Yes
05/27/20261 set of 3 4x8 cylinders to be broken at 28 day mark.Public - Test Data Visible
2026-04-28-9-6FFS 1-23: Field Investigation Report (FIR)Joseph Esteybar, CT D05 - Monterey Construction Field Laboratory04/28/202605/27/2026
Yes
05/27/20261 set of 3 4x8 cylinders to be broken at 6 hour mark.Public - Test Data Visible

Sample File Attachments

File NameExtensionDate UploadedActions
No results found.

Test File Attachments


DIME Test ID: 2026-04-28-9-2 FFS 1-23 (Verified)
DIME Test ID: 2026-04-28-9-3 FFS 1-23 (Verified)
DIME Test ID: 2026-04-28-9-4 FFS 1-23 (Verified)
DIME Test ID: 2026-04-28-9-5 FFS 1-23 (Verified)
DIME Test ID: 2026-04-28-9-6 FFS 1-23 (Verified)