Sample Record

DIME Sample ID 2026-02-20-27

Sample is locked from editing. info

Project Information

Project IdentifiersProject ID: 1000612
DEA: 120R57U4
EFIS: 1223000131
DIST-CO-RTE-PM12-ORA-405-11.4/24.2
Award Date01/14/2025
Closeout DateNot set
Work DescriptionPLACE JPCP (RSC) AND RHMA, AND MODIFY ELECTRICAL SYSTEMS.
Location DescriptionORANGE COUNTY FROM HARBOR BOULEVARD UNDERCROSSING IN COSTA MESA TO LOS ANGELES COUNTY LINE AT ROSSMOOR
QA Service Level1 (Verified on 09/30/2024)

Owner Lab

  • G3 Quality, Incorporated - Cerritos

Sample Information

Sample Taken Date02/20/2026 Sample Unique Key27
Date that the sample was received by the laboratory/organization performing the testing02/21/2026 Sample typeQuality Control
A brief description of the sample 6x12 Cylinders The quantity of what the sample constitutes8
From where was the sample collectedJob Site First name of sampler or witnessed byJulian
Last name of sampler or witnessed byCarmona Title of samplerQC Field Technician
Telephone number of sampler Laboratory sample identificationG3-25-CTS-389 Set 1
Linked DIME Sample ID The fabricator/manufacturer/facility nameSecurity Paving Company
Transportation Laboratory (TL) Number Inspector Lot Number from the Transportation Laboratory (TL) Form
Structure unique identifier Structure nameS/B Bolsa Approach Slab, Lane HOV/1
Bid ItemNot set

Material Information

Material TypeConcrete The concrete mix design numberG3-25-CTS-389
The truck number from where the sample was collectedLoad 1 The batch plant ticket number from where the sample was collected0
Concrete batch plantSecurity Paving Company The fabricator/manufacturer designation for the sampleSet 1
A detailed description of where the material sample was collectedS/B Bolsa Approach Slab, Lane HOV/1 Where the material sample would have been placed if not sampled
From Lot No. Bag Lot No.

Submitted Tests

DIME Test IDTest MethodTester Name, Testing LabDate TestedDate AddedVerified?Release DateTest CommentsPrivacy LevelActions
2026-02-20-27-1CTM 557-June 2020: Method of Test for Temperature of Freshly Mixed Hydraulic Cement ConcreteJulian Carmona, G3 Quality, Incorporated - Cerritos02/20/202604/24/2026
Yes
05/15/2026Public - Test Data Visible
2026-02-20-27-2CTM 518-June 2010: Method of Test for Unit Weight of Fresh ConcreteJulian Carmona, G3 Quality, Incorporated - Cerritos02/20/202604/24/2026
Yes
05/15/2026Public - Test Data Visible
2026-02-20-27-3CTM 504-June 2010: Method of Test for Determining Air Content of Freshly Mixed Concrete by the Pressure MethodJulian Carmona, G3 Quality, Incorporated - Cerritos02/20/202604/24/2026
Yes
05/15/2026Public - Test Data Visible
2026-02-20-27-4CTM 556-January 2018: Method of Test for Slump of Fresh Portland Cement ConcreteJulian Carmona, G3 Quality, Incorporated - Cerritos02/20/202604/24/2026
Yes
05/15/2026Public - Test Data Visible
2026-02-20-27-5CTM 521-June 2020: Method of Test for Compressive Strength of Molded Concrete CylindersJulian Carmona, G3 Quality, Incorporated - Cerritos02/20/202604/24/2026
Yes
05/15/2026Public - Test Data Visible
2026-02-20-27-6CTM 521-June 2020: Method of Test for Compressive Strength of Molded Concrete CylindersIsac Vasquez, G3 Quality, Incorporated - Cerritos03/21/202604/24/2026
Yes
05/15/2026Public - Test Data Visible

Sample File Attachments

File NameExtensionDate UploadedActions
No results found.

Test File Attachments


DIME Test ID: 2026-02-20-27-1 CTM 557-June 2020 (Verified)
DIME Test ID: 2026-02-20-27-2 CTM 518-June 2010 (Verified)
DIME Test ID: 2026-02-20-27-3 CTM 504-June 2010 (Verified)
DIME Test ID: 2026-02-20-27-4 CTM 556-January 2018 (Verified)
DIME Test ID: 2026-02-20-27-5 CTM 521-June 2020 (Verified)
DIME Test ID: 2026-02-20-27-6 CTM 521-June 2020 (Verified)