Sample Record
Owner Labs
- CT HQ - QASI Sacramento Field Office
- CT HQ - Sacramento Structural Materials Testing Laboratory
DIME Sample ID 2026-04-24-4
Project Information
| Project Identifiers | Project ID: 1001281 DEA: 11430234 EFIS: 1118000029 |
|---|---|
| DIST-CO-RTE-PM | 11-SD-805-0.1/14.6 |
| Award Date | Not set |
| Closeout Date | Not set |
| Work Description | REPLACE CONC PVMT, CONSTRUCT AUX LANE & BIKE TRAIL, ELECT, & LANDSCAPE |
| Location Description | SAN DIEGO COUNTY IN SAN DIEGO, CHULA VISTA AND NATIONAL CITY FROM 0.3 MILE SOUTH OF ROUTE 805/5 SEPARATION TO ROUTE 805/15 SEPARATION |
| QA Service Level | 1 (Verified on 06/09/2025) |
Sample Information
| Sample Taken Date | 04/24/2026 | Sample Unique Key | 4 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | No | Date that the sample was received by the laboratory/organization performing the testing | 04/29/2026 |
| Sample type | Quality Assurance | A brief description of the sample | #8 rebar 5'-2" hoops |
| The quantity of what the sample constitutes | 384 pcs | From where was the sample collected | Fabricator |
| First name of sampler or witnessed by | Joaquin | Last name of sampler or witnessed by | Moreno |
| Title of sampler | Quality Assurance Inspector | Telephone number of sampler | 9095268064 |
| Laboratory sample identification | Linked DIME Sample ID | ||
| The fabricator/manufacturer/facility name | RKR Steel Welding | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | L161-033-26 | Structure unique identifier | |
| Structure name | Bid Item | 185 - BAR REINFORCING STEEL (BRIDGE) |
Material Information
| Material Type | SMTL TM5 - Welded Hoops | Production or Authorization Testing | Authorization Testing |
|---|---|---|---|
| Service or Ultimate | Ultimate | Rebar Heat Number(s) | 389925 |
| Hoop Manufacturer Lot Number(s) | Lot #1-3 | Material Standard Code | ASTM A706 |
| Material Grade | 60 | Rebar Size | #8 |
| Diameter of Hoop | 5'-2" | Epoxy Coated | No |
| Epoxy Coating Color | NA | Rebar Manufacturer | Cascade Steel |
| Welding Company | RKR Steel Welding | Coating Standards | Uncoated |
| Weld Type | Flash Welded |
Submitted Tests
Sample File Attachments
| File Name | Extension | Date Uploaded | Actions |
|---|---|---|---|
| No results found. | |||
Test File Attachments
DIME Test ID: 2026-04-24-4-1 CTM 670-December 2013 (Verified)
