Sample Record

DIME Sample ID 2026-04-17-3

Project Information

Project IdentifiersProject ID: 994443
DEA: 053307C4
EFIS: 0514000028
DIST-CO-RTE-PM05-SLO-41,46-44.5/45.3,54.0/57.8
Award Date02/27/2023
Closeout DateNot set
Work DescriptionWye Segment - Route 41/46 Separation
Location DescriptionNot set
QA Service Level1 (Verified on 12/16/2022)

Owner Labs

  • CT D06 - Millbrook Field Laboratory
  • CT HQ - FFS - Field Investigation Team (FIT)

Sample Information

Sample Taken Date04/17/2026 Sample Unique Key3
Date that the sample was received by the laboratory/organization performing the testing04/17/2026 Sample typeAcceptance
A brief description of the sampleSkid Testing Request The quantity of what the sample constitutesMultiple Lanes
From where was the sample collectedJob Site First name of sampler or witnessed byCristian
Last name of sampler or witnessed bySuarez Title of sampler
Telephone number of sampler Laboratory sample identification
Linked DIME Sample ID The fabricator/manufacturer/facility nameATKINSON CONSTRUCTION
Transportation Laboratory (TL) Number Inspector Lot Number from the Transportation Laboratory (TL) Form
Structure unique identifier49-0276 R Structure nameCholame Creek Bridge Right
Bid Item96 - STRUCTURAL CONCRETE, BRIDGE (POLYMER FIBER)

Material Information

Material TypeRoadway/Bridge Surface Pavement Surface TypePCC (Portland Cement Concrete)
Type of Traffic Control ProvidedBehind K-Rail/Barrier DIST-CO-RTE05-SLO-46
Direction of TravelEast Post Mile54.91
Lanes to be TestedShoulder,Lane #1,Lane #2 Station

Submitted Tests

DIME Test IDTest MethodTester Name, Testing LabDate TestedDate AddedVerified?Release DateTest CommentsPrivacy LevelActions
No results found.

Sample File Attachments

File NameExtensionDate UploadedActions
No results found.

Test File Attachments