Project IdentifiersProject ID: 1000611
DEA: 120R32U4
EFIS: 1222000054
DIST-CO-RTE-PM12-ORA-55-0.2/R17.8
Award Date02/07/2025
Closeout DateNot set
Work DescriptionCOLD PLANE, PLACE RHMA, REPLACE CB, SIGNS AND MODIFY LIGHTING SYSTEM.
Location DescriptionORANGE COUNTY FROM 0.1 MILE SOUTH OF ROUTE 55/1 SEPARATION IN NEWPORT BEACH TO ROUTE 55/91 SEPARATION IN ANAHEIM
QA Service Level1 (Verified on 09/30/2024)

Owner Lab

  • CT D12 - Huntington Beach Field Laboratory

Sample Information

Sample Taken Date03/24/2026 Sample Unique Key34
Date that the sample was received by the laboratory/organization performing the testing03/25/2026 Sample typeQuality Assurance
A brief description of the sampleConcrete beams The quantity of what the sample constitutes3
From where was the sample collectedJob Site First name of sampler or witnessed byG3
Last name of sampler or witnessed byG3 Title of sampler
Telephone number of sampler Laboratory sample identification26-0044
Linked DIME Sample ID The fabricator/manufacturer/facility nameSHORTLOAD CONCRETE INC
Transportation Laboratory (TL) Number Inspector Lot Number from the Transportation Laboratory (TL) Form
Structure unique identifier Structure name
Bid ItemNot set

Material Information

Material TypeConcrete The concrete mix design numberCTS-65-EHI
The truck number from where the sample was collected The batch plant ticket number from where the sample was collectedUnknown
Concrete batch plant The fabricator/manufacturer designation for the sample
A detailed description of where the material sample was collectedDischarge from concrete truck into wheelbarrow. Where the material sample would have been placed if not sampledTest Slab
From Lot No. Bag Lot No.

Submitted Tests

DIME Test IDTest MethodTester Name, Testing LabDate TestedDate AddedVerified?Release DateTest CommentsPrivacy LevelActions
2026-03-24-34-1CTM 523-May 2020: Method of Test for Flexural Strength of ConcreteDan Morris, CT D12 - Huntington Beach Field Laboratory03/27/202603/27/2026
Yes
03/27/2026Public - Test Data Visible
2026-03-24-34-2CTM 523-May 2020: Method of Test for Flexural Strength of ConcreteDan Morris, CT D12 - Huntington Beach Field Laboratory04/01/202604/01/2026
Yes
04/01/2026Public - Reportable Fields Only

Sample File Attachments

File NameExtensionDate UploadedActions
No results found.

Test File Attachments


DIME Test ID: 2026-03-24-34-1 CTM 523-May 2020 (Verified)
File NameExtensionDate UploadedTest IDActions
26-0044Bpdf03/27/20262026-03-24-34-1   Info

DIME Test ID: 2026-03-24-34-2 CTM 523-May 2020 (Verified)
File NameExtensionDate UploadedTest IDActions
26-0044B8Dpdf04/01/20262026-03-24-34-2   Info