Sample Record

Owner Lab

  • CT D08 - Fontana Field Testing Laboratory

DIME Sample ID 2025-09-24-108

Sample is locked from editing. info

Project Information

Project IdentifiersProject ID: 1000081
DEA: 081J5404
EFIS: 0818000069
DIST-CO-RTE-PM08-SBD-15-2.4
Award Date04/02/2025
Closeout DateNot set
Work DescriptionCB, JPCP (RSC), STRUCTURAL CONCRETE AND MODIFYING LIGHTING SYSTEMS.
Location DescriptionSAN BERNARDINO COUNTY IN ONTARIO AT ROUTE 10/15 SEPARATION
QA Service Level1 (Verified on 02/06/2024)

Sample Information

Sample Taken Date09/24/2025 Sample Unique Key108
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing09/24/2025
Sample typeAcceptance A brief description of the sampleNative Subgrade, Retest
The quantity of what the sample constitutes29.8 kg From where was the sample collectedJob Site
First name of sampler or witnessed byGabriel Last name of sampler or witnessed byRamirez
Title of sampler Telephone number of sampler
Laboratory sample identification Linked DIME Sample ID2025-09-19-84
The fabricator/manufacturer/facility nameCTM 231 TEST LOCATION Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name Bid ItemNot set

Material Information

Material TypeSoil The fabricator's/manufacturer's product name for the sample
The fabricator/manufacturer designation for the sample A detailed description of where the material sample was collectedI-15 SB to I-10 EB Connector, Retaining Wall Footing 302, Sta 134+05 - 137+66
Where the material sample would have been placed if not sampled

Submitted Tests

DIME Test IDTest MethodTester Name, Testing LabDate TestedDate AddedVerified?Release DateTest CommentsPrivacy LevelActions
2025-09-24-108-1CTM 231-March 2013: Method of Test for Relative Compaction of Untreated and Treated Soils and Aggregates Using Nuclear GagesGabriel Ramirez, CT D08 - Fontana Field Testing Laboratory09/24/202502/26/2026
Yes
02/26/2026Public - Test Data Visible
2025-09-24-108-2CTM 216-June 2011: Method of Test for Relative Compaction of Untreated and Treated Soils and AggregatesGabriel Ramirez, CT D08 - Fontana Field Testing Laboratory09/24/202502/26/2026
Yes
02/26/2026Public - Test Data Visible

Sample File Attachments

File NameExtensionDate UploadedActions
No results found.

Test File Attachments


DIME Test ID: 2025-09-24-108-1 CTM 231-March 2013 (Verified)
DIME Test ID: 2025-09-24-108-2 CTM 216-June 2011 (Verified)