Sample Record
DIME Sample ID 2026-01-22-73
Project Information
| Project Identifiers | Project ID: 1000741 DEA: 041Y7204 EFIS: 0423000018 |
|---|---|
| DIST-CO-RTE-PM | 04-SF-80-5.7/7.7 |
| Award Date | 05/16/2025 |
| Closeout Date | Not set |
| Work Description | STRUCTURAL CONCRETE, BRIDGE (RSC) & JOINT SEAL. |
| Location Description | THE CITY AND COUNTY OF SAN FRANCISCO AT VARIOUS LOCATIONS FROM 0.1 MILE EAST OF FREMONT STREET OFF-RAMP TO 0.2 MILE WEST OF YERBA BUENA ISLAND OFF-RAMP |
| QA Service Level | 1 (Verified on 10/17/2024) |
Owner Labs
- CT SC - 3674 - Pacifica 1
- CT HQ - Vallejo Field Laboratory
Sample Information
| Sample Taken Date | 01/22/2026 | Sample Unique Key | 73 |
|---|---|---|---|
| Date that the sample was received by the laboratory/organization performing the testing | 02/25/2026 | Sample type | Quality Control |
| A brief description of the sample | Rapid Strength Concrete | The quantity of what the sample constitutes | 2 CY |
| From where was the sample collected | Job Site | First name of sampler or witnessed by | Sebastian |
| Last name of sampler or witnessed by | Mofor | Title of sampler | |
| Telephone number of sampler | Laboratory sample identification | ||
| Linked DIME Sample ID | The fabricator/manufacturer/facility name | Precision Concrete | |
| Transportation Laboratory (TL) Number | Inspector Lot Number from the Transportation Laboratory (TL) Form | ||
| Structure unique identifier | Structure name | ||
| Bid Item | Not set |
Material Information
| Material Type | Concrete | The concrete mix design number | N/A |
|---|---|---|---|
| The truck number from where the sample was collected | The batch plant ticket number from where the sample was collected | 8537-1 | |
| Concrete batch plant | The fabricator/manufacturer designation for the sample | ||
| A detailed description of where the material sample was collected | wheelbarrow | Where the material sample would have been placed if not sampled | |
| From Lot No. | Bag Lot No. |
Submitted Tests
Sample File Attachments
| File Name | Extension | Date Uploaded | Actions |
|---|---|---|---|
| 10C317912 2026-01-22-73-1 | 03/03/2026 | Info |
Test File Attachments
DIME Test ID: 2026-01-22-73-1 ASTM C39-21 (Verified)