Sample Record

Owner Lab

  • CT D08 - Fontana Field Testing Laboratory

DIME Sample ID 2025-12-12-53

Sample is locked from editing. info

Project Information

Project IdentifiersProject ID: 1000501
DEA: 081J6104
EFIS: 0818000102
DIST-CO-RTE-PM08-RIV-215-40.5/42.7
Award Date11/05/2024
Closeout DateNot set
Work DescriptionINDIVIDUAL SLAB REPLACEMENT (RSC), RHMA, AND REPLACE BASE.
Location DescriptionRIVERSIDE COUNTY IN RIVERSIDE FROM 0.8 MILE SOUTH OF ROUTE 60/91 SEPARATION TO 0.4 MILE SOUTH OF MARTIN LUTHER KING BOULEVARD UNDERCROSSING
QA Service Level1 (Verified on 09/02/2024)

Sample Information

Sample Taken Date12/12/2025 Sample Unique Key53
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing12/12/2025
Sample typeAcceptance A brief description of the sampleNative Subgrade
The quantity of what the sample constitutes21.1 kg From where was the sample collectedJob Site
First name of sampler or witnessed byDylan Last name of sampler or witnessed byNault
Title of sampler Telephone number of sampler
Laboratory sample identification Linked DIME Sample ID
The fabricator/manufacturer/facility nameCTM 231 TEST LOCATION Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name Bid ItemNot set

Material Information

Material TypeSoil The fabricator's/manufacturer's product name for the sample
The fabricator/manufacturer designation for the sample A detailed description of where the material sample was collectedNB I-215 / EB SR-60, University Ave, Vegetation Control
Where the material sample would have been placed if not sampled

Submitted Tests

DIME Test IDTest MethodTester Name, Testing LabDate TestedDate AddedVerified?Release DateTest CommentsPrivacy LevelActions
2025-12-12-53-1CTM 231-March 2013: Method of Test for Relative Compaction of Untreated and Treated Soils and Aggregates Using Nuclear GagesDylan Nault, CT D08 - Fontana Field Testing Laboratory12/12/202502/20/2026
Yes
02/20/2026Density Spec 90%Public - Test Data Visible
2025-12-12-53-2CTM 216-June 2011: Method of Test for Relative Compaction of Untreated and Treated Soils and AggregatesDylan Nault, CT D08 - Fontana Field Testing Laboratory12/12/202502/20/2026
Yes
02/20/2026Density Spec 90%Public - Test Data Visible

Sample File Attachments

File NameExtensionDate UploadedActions
No results found.

Test File Attachments


DIME Test ID: 2025-12-12-53-1 CTM 231-March 2013 (Verified)
DIME Test ID: 2025-12-12-53-2 CTM 216-June 2011 (Verified)