Sample Record

Owner Lab

  • Kleinfelder, Incorporated - Los Angeles

DIME Sample ID 2026-01-24-7

Project Information

Project IdentifiersProject ID: 995193
DEA: 07356604
EFIS: 0719000026
DIST-CO-RTE-PM07-LA-605-R10.2/20.2
Award Date04/04/2024
Closeout DateNot set
Work DescriptionLANE & SLAB REPLACEMENT, COLD PLANE & HMA OVERLAY.
Location DescriptionLOS ANGELES COUNTY IN SANTA FE SPRINGS, PICO RIVERA, WHITTIER, CITY OF INDUSTRY AND EL MONTE FROM TELEGRAPH ROAD UNDERCROSSING TO ROUTE 605/10 SEPARATION
QA Service Level1 (Verified on 10/03/2023)

Sample Information

Sample Taken Date01/24/2026 Sample Unique Key7
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing01/24/2026
Sample typeQuality Assurance A brief description of the sampleLCB-RS
The quantity of what the sample constitutes10 CY of 685.2 CY From where was the sample collectedJob Site
First name of sampler or witnessed byDominic Last name of sampler or witnessed byMontemayor
Title of samplerField Technician Telephone number of sampler951-764-3140
Laboratory sample identification26-0259 Linked DIME Sample ID
The fabricator/manufacturer/facility nameMyers & Son's Irwindale batch plant Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name Bid ItemNot set

Material Information

Material TypeConcrete The concrete mix design numberT35skESLCB
The truck number from where the sample was collected2 The batch plant ticket number from where the sample was collected2
Concrete batch plant The fabricator/manufacturer designation for the sample
A detailed description of where the material sample was collectedTruck Chute Where the material sample would have been placed if not sampled
From Lot No. Bag Lot No.

Submitted Tests

DIME Test IDTest MethodTester Name, Testing LabDate TestedDate AddedVerified?Release DateTest CommentsPrivacy LevelActions
2026-01-24-7-1CTM 521-June 2020: Method of Test for Compressive Strength of Molded Concrete CylindersJeffrey Diaz, Kleinfelder, Incorporated - Los Angeles01/31/202602/03/2026
Yes
02/03/2026Public - Test Data Visible

Sample File Attachments

File NameExtensionDate UploadedActions
No results found.

Test File Attachments


DIME Test ID: 2026-01-24-7-1 CTM 521-June 2020 (Verified)