Sample Record
DIME Sample ID 2026-01-09-40
Project Information
| Project Identifiers | Project ID: 1001464 DEA: 072XU404 EFIS: 0725000290 |
|---|---|
| DIST-CO-RTE-PM | 07--101-36.2 |
| Award Date | Not set |
| Closeout Date | Not set |
| Work Description | Replace damaged slabs with ISR-RSC |
| Location Description | Not set |
| QA Service Level | 1 (Verified on 08/19/2025) |
Owner Lab
- CT D07 - Materials Field Laboratory, Unit 1953
Sample Information
| Sample Taken Date | 01/09/2026 | Sample Unique Key | 40 |
|---|---|---|---|
| Date that the sample was received by the laboratory/organization performing the testing | 01/09/2026 | Sample type | Acceptance |
| A brief description of the sample | 6x6x18 Beams | The quantity of what the sample constitutes | 130 CY |
| From where was the sample collected | Job Site | First name of sampler or witnessed by | Kristian |
| Last name of sampler or witnessed by | Lopez | Title of sampler | RMA QC |
| Telephone number of sampler | Laboratory sample identification | 26-0076 | |
| Linked DIME Sample ID | The fabricator/manufacturer/facility name | Troop | |
| Transportation Laboratory (TL) Number | Inspector Lot Number from the Transportation Laboratory (TL) Form | ||
| Structure unique identifier | Structure name | ||
| Bid Item | Not set |
Material Information
| Material Type | Concrete | The concrete mix design number | NA |
|---|---|---|---|
| The truck number from where the sample was collected | The batch plant ticket number from where the sample was collected | NA | |
| Concrete batch plant | TROOP | The fabricator/manufacturer designation for the sample | |
| A detailed description of where the material sample was collected | truck chute | Where the material sample would have been placed if not sampled | |
| From Lot No. | Bag Lot No. |
Submitted Tests
Sample File Attachments
| File Name | Extension | Date Uploaded | Actions |
|---|---|---|---|
| No results found. | |||
Test File Attachments
DIME Test ID: 2026-01-09-40-1 CTM 524-March 2013 (Verified)