Sample Record

DIME Sample ID 2026-01-15-35

Project Information

Project IdentifiersProject ID: 995493
DEA: 081G6704
EFIS: 0816000049
DIST-CO-RTE-PM08-RIV-79-5.4/11.4
Award Date05/23/2024
Closeout DateNot set
Work DescriptionHOT MIX ASPHALT, SOIL NAIL, STRUCTURAL CONCRETE AND ROADWAY EXC.
Location DescriptionRIVERSIDE COUNTY NEAR TEMECULA FROM 0.4 MILE SOUTH OF SAGE ROAD TO 1.1 MILES SOUTH OF PAUBA ROAD
QA Service Level1 (Verified on 12/18/2023)

Owner Lab

  • CT D08 - Fontana Southern Regional Laboratory

Sample Information

Sample Taken Date01/15/2026 Sample Unique Key35
Date that the sample was received by the laboratory/organization performing the testing01/20/2026 Sample typeQuality Assurance
A brief description of the sample4x8 The quantity of what the sample constitutes8
From where was the sample collectedJob Site First name of sampler or witnessed byAhmed
Last name of sampler or witnessed byHamasha Title of sampler
Telephone number of sampler Laboratory sample identification1085-07
Linked DIME Sample ID The fabricator/manufacturer/facility namenp
Transportation Laboratory (TL) Number178707 Inspector Lot Number from the Transportation Laboratory (TL) Form
Structure unique identifier Structure name
Bid ItemNot set

Material Information

Material TypeConcrete The concrete mix design number5236125A
The truck number from where the sample was collected The batch plant ticket number from where the sample was collectedna
Concrete batch plant The fabricator/manufacturer designation for the sample
A detailed description of where the material sample was collectedna Where the material sample would have been placed if not sampled
From Lot No. Bag Lot No.

Submitted Tests

DIME Test IDTest MethodTester Name, Testing LabDate TestedDate AddedVerified?Release DateTest CommentsPrivacy LevelActions
No results found.

Sample File Attachments

File NameExtensionDate UploadedActions
No results found.

Test File Attachments