Sample Record
Owner Lab
- G3 Quality, Incorporated - Cerritos
DIME Sample ID 2026-01-05-3
Project Information
| Project Identifiers | Project ID: 1000777 DEA: 07370404 EFIS: 0720000128 |
|---|---|
| DIST-CO-RTE-PM | 07-LA-5-R59.5/R73.7 |
| Award Date | 02/06/2025 |
| Closeout Date | Not set |
| Work Description | COLD PLANE AC PAVEMENT, PLACE HOT MIX ASPHALT AND INSTALL MGS. |
| Location Description | LOS ANGELES COUNTY FROM LAKE HUGHES ROAD UNDERCROSSING TO 0.7 MILE SOUTH OF VISTA DEL LAGO ROAD OVERCROSSING. |
| QA Service Level | 1 (Verified on 11/25/2024) |
Sample Information
| Sample Taken Date | 01/05/2026 | Sample Unique Key | 3 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 01/06/2026 |
| Sample type | Quality Control | A brief description of the sample | 4x8 cylinders |
| The quantity of what the sample constitutes | 6 | From where was the sample collected | Job Site |
| First name of sampler or witnessed by | Brenda | Last name of sampler or witnessed by | Amaya |
| Title of sampler | QC Field Technician | Telephone number of sampler | |
| Laboratory sample identification | Linked DIME Sample ID | S63C451T1 Set 1 | |
| The fabricator/manufacturer/facility name | National Ready Mix Santa Clarita | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | S/B North Barrier Wall Transition at I-5 Templin Rt Shldr | Bid Item | Not set |
Material Information
| Material Type | Concrete | The concrete mix design number | S63C451T1 |
|---|---|---|---|
| The truck number from where the sample was collected | 1 | The batch plant ticket number from where the sample was collected | 0 |
| Concrete batch plant | National Ready Mix | The fabricator/manufacturer designation for the sample | Set 1 |
| A detailed description of where the material sample was collected | S/B North Barrier Wall Transition at I-5 Templin Rt Shldr | Where the material sample would have been placed if not sampled | |
| From Lot No. | 1 | Bag Lot No. | 1 |
Submitted Tests
| DIME Test ID | Test Method | Tester Name, Testing Lab | Date Tested | Date Added | Verified? | Release Date | Test Comments | Privacy Level | Actions |
|---|---|---|---|---|---|---|---|---|---|
| 2026-01-05-3-1 | CTM 518-June 2010: Method of Test for Unit Weight of Fresh Concrete | Brenda Amaya, G3 Quality, Incorporated - Cerritos | 01/05/2026 | 01/08/2026 | No | ||||
| 2026-01-05-3-2 | CTM 504-June 2010: Method of Test for Determining Air Content of Freshly Mixed Concrete by the Pressure Method | Brenda Amaya, G3 Quality, Incorporated - Cerritos | 01/05/2026 | 01/08/2026 | No | ||||
| 2026-01-05-3-3 | CTM 556-January 2018: Method of Test for Slump of Fresh Portland Cement Concrete | Brenda Amaya, G3 Quality, Incorporated - Cerritos | 01/05/2026 | 01/08/2026 | No | ||||
| 2026-01-05-3-4 | CTM 557-June 2020: Method of Test for Temperature of Freshly Mixed Hydraulic Cement Concrete | Brenda Amaya, G3 Quality, Incorporated - Cerritos | 01/05/2026 | 01/08/2026 | No |
Sample File Attachments
| File Name | Extension | Date Uploaded | Actions |
|---|---|---|---|
| No results found. | |||
Test File Attachments
DIME Test ID: 2026-01-05-3-1 CTM 518-June 2010
DIME Test ID: 2026-01-05-3-2 CTM 504-June 2010
DIME Test ID: 2026-01-05-3-3 CTM 556-January 2018
DIME Test ID: 2026-01-05-3-4 CTM 557-June 2020