Sample Record

DIME Sample ID 2025-09-11-101

Project Information

Project IdentifiersProject ID: 995262
DEA: 041Q4604
EFIS: 0418000279
DIST-CO-RTE-PM04-SCL-280-0/2.7
Award Date05/02/2024
Closeout DateNot set
Work DescriptionRHMA-G SURFACING AND CONSTRUCT BRIDGE APPROACH.
Location DescriptionSANTA CLARA COUNTY IN SAN JOSE FROM ROUTE 280/680/101 SEPARATION TO 0.2 MILE WEST OF BIRD AVENUE OVERCROSSING
QA Service Level1 (Verified on 12/11/2023)

Owner Lab

  • CT D04 - San Jose Construction Field Laboratory

Sample Information

Sample Taken Date09/11/2025 Sample Unique Key101
Date that the sample was received by the laboratory/organization performing the testing09/18/2025 Sample typeQuality Assurance
A brief description of the sample3/4"RHMA-G The quantity of what the sample constitutes0-750 Tons
From where was the sample collectedJob Site First name of sampler or witnessed byDave
Last name of sampler or witnessed byG. Title of samplerPEI QC
Telephone number of sampler Laboratory sample identification SJ-091525-T275-T269-L1SL19
Linked DIME Sample ID The fabricator/manufacturer/facility nameMartin Marietta Sunol Drier Drum Plant
Transportation Laboratory (TL) NumberC922125 Inspector Lot Number from the Transportation Laboratory (TL) Form
Structure unique identifier Structure name
Bid ItemNot set

Material Information

Material TypeHot Mix Asphalt HMA TypeRHMA-G
HMA Grading3/4 inch Lot number1
Sublot number19 HMA Mix Number63S4BV 25W1C 8967
Binder content (%)0.0 Virgin binder PG
Design binder PG Binder Supplier
RAP content (%)Not set WMA Additives
Antistrip type

Submitted Tests

DIME Test IDTest MethodTester Name, Testing LabDate TestedDate AddedVerified?Release DateTest CommentsPrivacy LevelActions
No results found.

Sample File Attachments

File NameExtensionDate UploadedActions
No results found.

Test File Attachments