Sample Record

Owner Lab

  • CT D01 - Crescent City Field Laboratory

DIME Sample ID 2025-12-17-9

Project Information

Project IdentifiersProject ID: 215620
DEA: 01436404
EFIS: 0100000193
DIST-CO-RTE-PM01-DN-101-35.8/36.5
Award Date07/11/2022
Closeout DateNot set
Work DescriptionDr. Fine Bridge Replacement
Location DescriptionDR. FINE BRIDGE REPLACEMENT FROM LAKE EARL DR TO S FRED D. HAIGHT DR ON HWY 101 ACROSS SMITH RIVER.
QA Service Level1 (Verified on 03/26/2021)

Sample Information

Sample Taken Date12/17/2025 Sample Unique Key9
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing12/19/2025
Sample typeQuality Assurance A brief description of the sampleApproach Slab South
The quantity of what the sample constitutes100 From where was the sample collectedJob Site
First name of sampler or witnessed byAndre Last name of sampler or witnessed byWoods
Title of sampler Telephone number of sampler
Laboratory sample identification Linked DIME Sample ID
The fabricator/manufacturer/facility nameTidewater Starry pit Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name Bid ItemNot set

Material Information

Material TypeConcrete The concrete mix design numberSR-C2 (B) NA
The truck number from where the sample was collected The batch plant ticket number from where the sample was collectedxxxx
Concrete batch plant The fabricator/manufacturer designation for the sample
A detailed description of where the material sample was collectedBack of truck Where the material sample would have been placed if not sampled
From Lot No. Bag Lot No.

Submitted Tests

DIME Test IDTest MethodTester Name, Testing LabDate TestedDate AddedVerified?Release DateTest CommentsPrivacy LevelActions
2025-12-17-9-1CTM 521-June 2020: Method of Test for Compressive Strength of Molded Concrete CylindersJoshua Erler, CT D01 - Crescent City Field Laboratory 12/23/202501/05/2026
Yes
01/05/20267 dayPublic - Test Data Visible
2025-12-17-9-2CTM 521-June 2020: Method of Test for Compressive Strength of Molded Concrete CylindersJoshua Erler, CT D01 - Crescent City Field Laboratory 12/31/202501/05/2026
Yes
01/05/2026Public - Test Data Visible

Sample File Attachments

File NameExtensionDate UploadedActions
No results found.

Test File Attachments


DIME Test ID: 2025-12-17-9-1 CTM 521-June 2020 (Verified)
DIME Test ID: 2025-12-17-9-2 CTM 521-June 2020 (Verified)