Sample Record

DIME Sample ID 2025-12-09-35

Project Information

Project IdentifiersProject ID: 995493
DEA: 081G6704
EFIS: 0816000049
DIST-CO-RTE-PM08-RIV-79-5.4/11.4
Award Date05/23/2024
Closeout DateNot set
Work DescriptionHOT MIX ASPHALT, SOIL NAIL, STRUCTURAL CONCRETE AND ROADWAY EXC.
Location DescriptionRIVERSIDE COUNTY NEAR TEMECULA FROM 0.4 MILE SOUTH OF SAGE ROAD TO 1.1 MILES SOUTH OF PAUBA ROAD
QA Service Level1 (Verified on 12/18/2023)

Owner Lab

  • CT HQ - Sacramento Structural Materials Testing Laboratory

Sample Information

Sample Taken Date12/09/2025 Sample Unique Key35
Date that the sample was received by the laboratory/organization performing the testing12/12/2025 Sample typeQuality Assurance
A brief description of the sampleA615 Bar The quantity of what the sample constitutes2
From where was the sample collectedManufacturer First name of sampler or witnessed byNA
Last name of sampler or witnessed byNA Title of sampler
Telephone number of sampler Laboratory sample identification
Linked DIME Sample ID The fabricator/manufacturer/facility nameDywidag Systems
Transportation Laboratory (TL) Number Inspector Lot Number from the Transportation Laboratory (TL) Form
Structure unique identifier Structure name
Bid ItemNot set

Material Information

Material TypeSMTL TM5 - Threaded Bar Production or Authorization TestingProduction Testing
Threaded Bar SpecificationASTM A615 Threaded Bar Grade75
Threaded Bar TypeDeformed Rebar Size#8
Nut Specification for Threaded BarA519 System ManufacturerDywidag Systems
Epoxy Coating ColorNA Threaded Bar Application
Coating StandardsUncoated Bar Heat Number(s)5912571202, 5806698304
Nut Heat Number(s)74136318 Bar Lot Number
Nut Lot Number Coupler Heat Number(s)
Coupler Grade

Submitted Tests

DIME Test IDTest MethodTester Name, Testing LabDate TestedDate AddedVerified?Release DateTest CommentsPrivacy LevelActions
No results found.

Sample File Attachments

File NameExtensionDate UploadedActions
No results found.

Test File Attachments