Sample Record

Owner Lab

  • CT D11 - District 11 Materials Laboratory

DIME Sample ID 2025-10-29-60

Project Information

Project IdentifiersProject ID: 1000575
DEA: 11430904
EFIS: 1119000199
DIST-CO-RTE-PM11-SD-5,805-Var
Award Date02/12/2025
Closeout DateNot set
Work DescriptionRESURFACE BRIDGE, REPLACE BRIDGE BARRIER, MGS, AND MODIFY ELECT.
Location DescriptionSAN DIEGO COUNTY AT VARIOUS LOCATIONS
QA Service Level1 (Verified on 04/04/2025)

Sample Information

Sample Taken Date10/29/2025 Sample Unique Key60
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing11/03/2025
Sample typeProduction Start-Up A brief description of the samplePSU
The quantity of what the sample constitutes12 boxes From where was the sample collectedSupplier
First name of sampler or witnessed byMohammed Last name of sampler or witnessed byMasud
Title of samplerTET Telephone number of sampler6199021073
Laboratory sample identification25-09-22-43-PSU Linked DIME Sample ID2025-09-22-44
The fabricator/manufacturer/facility nameVulcan Otay Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name Bid ItemNot set

Material Information

Material TypeHot Mix Asphalt HMA TypeType A HMA
HMA Grading1/2 inch Lot number
Sublot number HMA Mix Number320200 Otay Val
Binder content (%)4.9 Virgin binder PG PG58-16
Design binder PG PG 64-16 Binder SupplierValero
RAP content (%)22 WMA AdditivesNo
Antistrip typeNo

Submitted Tests

DIME Test IDTest MethodTester Name, Testing LabDate TestedDate AddedVerified?Release DateTest CommentsPrivacy LevelActions
No results found.

Sample File Attachments

File NameExtensionDate UploadedActions
No results found.

Test File Attachments