Sample Record

DIME Sample ID 2017-11-01-23

Project Information

Project IdentifiersProject ID: 99999
DEA: 0322222
DIST-CO-RTE-PM03-SAC,OMG-888,99,80-0.6-0.6
Award DateNot set
Closeout DateNot set
Work DescriptionTHIS PROJECT RECORD WAS ADDED FOR DIME TESTERS - DATA SUBMITTED FOR THIS PROJECT SHOULD NOT BE USED FOR ANY OTHER PURPOSES.
Location DescriptionTHIS PROJECT RECORD WAS ADDED FOR DIME TESTERS - DATA SUBMITTED FOR THIS PROJECT SHOULD NOT BE USED FOR ANY OTHER PURPOSES.
QA Service Level (Verified on 04/05/2013)

Owner Lab

  • CT HQ - Sacramento Materials Management Branch Field Office

Sample Information

Sample Taken Date11/01/2017 Sample Unique Key23
Date that the sample was received by the laboratory/organization performing the testingNot set Sample typeQuality Control
A brief description of the sampleRAP ignition 3 The quantity of what the sample constitutes1
From where was the sample collectedSource First name of sampler or witnessed byDime
Last name of sampler or witnessed byTest Title of sampler
Telephone number of sampler Laboratory sample identification
Linked DIME Sample ID The fabricator/manufacturer/facility nameTest
Transportation Laboratory (TL) Number Inspector Lot Number from the Transportation Laboratory (TL) Form
Structure unique identifierNot set Structure nameNot set
Bid ItemNot set

Material Information

Material TypeReclaimed Asphalt Pavement RAP SourceMustang Pit
Aggregate SizeNot set Aggregate SourceNot set
RAP StockpileNot set Stockpile Size (tons)Not set
Reclaimed Asphalt Pavement Mix NumberNot set

JMF Information

HMA Design IDJMF3512-2017-1-5202 Date Created12/22/2017
Submittal
Show (18)
JMF3511-6-2017-1 Submittal Authorized For Use| JMF3513-2017-1
JMF3511-6-2017-2 Submittal Completeness Review Failed
JMF3511-6-2017-3 Submittal Authorized For Use| JMF3513-2018-43
JMF3511-6-2018-14 Submittal Accepted for Verification
JMF3511-6-2018-15 Submittal Accepted for Verification| JMF3513-2018-9
JMF3511-6-2018-29 Submittal Completeness in Review
JMF3511-6-2018-33 Submittal Accepted for Verification| JMF3513-2018-28
JMF3511-6-2018-53 Submittal Accepted for Verification| JMF3513-2018-39
JMF3511-6-2018-55 Submittal Completeness in Review
JMF3511-6-2018-56 Submittal Accepted for Verification| JMF3513-2018-40
JMF3511-6-2018-57 Submittal Accepted for Verification
JMF3511-6-2018-58 Submittal Accepted for Verification| JMF3513-2020-96
JMF3511-6-2019-132 Submittal Completeness in Review
JMF3511-6-2020-166 Submittal Accepted for Verification| JMF3513-2024-50
JMF3511-6-2020-202 Submittal Accepted for Verification| JMF3513-2020-130
JMF3511-6-2020-278 Submittal Accepted for Verification| JMF3513-2021-36
JMF3511-6-2020-296 Submittal In Progress
JMF3511-6-2021-49 Submittal Accepted for Verification| JMF3513-2024-51

Submitted Tests

DIME Test IDTest MethodTester Name, Testing LabDate TestedDate AddedVerified?Release DateTest CommentsPrivacy LevelActions
2017-11-01-23-1AASHTO T30-15: Standard Method of Test for Mechanical Analysis of Extracted Aggregate (Mechanical Analysis)David Phong, CT HQ - Sacramento Materials Management Branch Field Office11/03/2017
Yes
11/03/2017Public - Test Data Visible
2017-11-01-23-2AASHTO T308-10: Standard Method of Test for Determining the Asphalt Binder Content of Hot Mix Asphalt (HMA) by the Ignition Method (Method A) (Asphalt Binder Content)David Phong, CT HQ - Sacramento Materials Management Branch Field Office11/03/2017
Yes
11/03/2017Public - Test Data Visible

Sample File Attachments

File NameExtensionDate UploadedActions
No results found.

Test File Attachments


DIME Test ID: 2017-11-01-23-1 AASHTO T30-15 (Verified)
DIME Test ID: 2017-11-01-23-2 AASHTO T308-10 (Verified)