Sample Record
Owner Lab
- CT D06 - Bakersfield Field Laboratory
DIME Sample ID 2025-12-03-11
Sample is locked from editing. info
Project Information
| Project Identifiers | Project ID: 1000300 DEA: 060S0504 EFIS: 0615000047 |
|---|---|
| DIST-CO-RTE-PM | 06-KER-166-17.5 |
| Award Date | 08/23/2024 |
| Closeout Date | Not set |
| Work Description | MICROPILING, STRUCTURAL CONCRETE, AND HOT MIX ASPHALT (TYPE A). |
| Location Description | KERN COUNTY NEAR METTLER AT CALIFORNIA AQUEDUCT BRIDGE |
| QA Service Level | 1 (Verified on 05/06/2024) |
Sample Information
| Sample Taken Date | 12/03/2025 | Sample Unique Key | 11 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 12/03/2025 |
| Sample type | Acceptance | A brief description of the sample | Native Material |
| The quantity of what the sample constitutes | Native material | From where was the sample collected | Job Site |
| First name of sampler or witnessed by | Neale | Last name of sampler or witnessed by | Brown |
| Title of sampler | Telephone number of sampler | ||
| Laboratory sample identification | Linked DIME Sample ID | ||
| The fabricator/manufacturer/facility name | Native | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | 29 - STRUCTURE BACKFILL (BRIDGE) |
Material Information
| Material Type | Soil | The fabricator's/manufacturer's product name for the sample | |
|---|---|---|---|
| The fabricator/manufacturer designation for the sample | A detailed description of where the material sample was collected | CTM 231 test location | |
| Where the material sample would have been placed if not sampled |
Submitted Tests
Sample File Attachments
| File Name | Extension | Date Uploaded | Actions |
|---|---|---|---|
| No results found. | |||
Test File Attachments
DIME Test ID: 2025-12-03-11-1 CTM 231-March 2013 (Verified)
| File Name | Extension | Date Uploaded | Test ID | Actions |
|---|---|---|---|---|
| 06-0S0504_37029_251203_21to23 | 12/03/2025 | 2025-12-03-11-1 | Info |
DIME Test ID: 2025-12-03-11-2 CTM 216-June 2011 (Verified)
| File Name | Extension | Date Uploaded | Test ID | Actions |
|---|---|---|---|---|
| 06-0S0504_37029_251203_21to23 | 12/03/2025 | 2025-12-03-11-2 | Info |
