Sample Record

Owner Lab

  • CT D01 - District 1 Materials Laboratory

DIME Sample ID 2025-11-25-19

Project Information

Project IdentifiersProject ID: 1000279
DEA: 023H70U4
EFIS: 0223000161
DIST-CO-RTE-PM02-TRI-299-15.0/25.7
Award Date08/09/2024
Closeout DateNot set
Work DescriptionRHMA-G, HMA (TYPE A), COLD PLANE AC, & SOLDIER PILE RETAINING WALL.
Location DescriptionTRINITY COUNTY NEAR DEL LOMA FROM 1.0 MILE EAST OF TRINITY RIVER BRIDGE NO.05-0006 TO 0.1 MILE WEST OF PRAIRIE CREEK ROAD
QA Service Level1 (Verified on 04/30/2024)

Sample Information

Sample Taken Date11/25/2025 Sample Unique Key19
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing11/26/2025
Sample typeAcceptance A brief description of the sampleType II V
The quantity of what the sample constitutes250 cy From where was the sample collectedJob Site
First name of sampler or witnessed byAndrew Last name of sampler or witnessed byGrinsell
Title of samplerASR Telephone number of sampler(707)-498-4009
Laboratory sample identification Linked DIME Sample ID
The fabricator/manufacturer/facility nameMercer Fraser Willow Crk Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name Bid Item67 - STRUCTURAL CONCRETE, BARRIER SLAB

Material Information

Material TypeConcrete The concrete mix design numberMF CL 1 .40 SLAG AE
The truck number from where the sample was collected700 The batch plant ticket number from where the sample was collected700162
Concrete batch plantMercer Fraser Willow Crk The fabricator/manufacturer designation for the sampleMercer Fraser
A detailed description of where the material sample was collectedReady Mix Truck Chute Where the material sample would have been placed if not sampledBarrier slab
From Lot No. Bag Lot No.

Submitted Tests

DIME Test IDTest MethodTester Name, Testing LabDate TestedDate AddedVerified?Release DateTest CommentsPrivacy LevelActions
2025-11-25-19-1CTM 557-July 2012: Method of Test for Temperature of Freshly Mixed Portland Cement ConcreteAndrew Grinsell, CT D01 - District 1 Materials Laboratory11/25/202511/26/2025
Yes
11/26/2025Public - Test Data Visible
2025-11-25-19-2CTM 556-January 2018: Method of Test for Slump of Fresh Portland Cement ConcreteAndrew Grinsell, CT D01 - District 1 Materials Laboratory11/25/202511/26/2025
Yes
11/26/2025Public - Test Data Visible

Sample File Attachments

File NameExtensionDate UploadedActions
No results found.

Test File Attachments


DIME Test ID: 2025-11-25-19-1 CTM 557-July 2012 (Verified)
DIME Test ID: 2025-11-25-19-2 CTM 556-January 2018 (Verified)