Sample Record
DIME Sample ID 2025-11-03-72
Sample is locked from editing. info
Project Information
| Project Identifiers | Project ID: 1000563 DEA: 021H7104 EFIS: 0217000013 |
|---|---|
| DIST-CO-RTE-PM | 02-SIS-3,5-L47.4,R45.5/R46.0 |
| Award Date | 11/13/2024 |
| Closeout Date | Not set |
| Work Description | NEW MECHANIC SHOP AT YREKA MAINTENANCE STATION. |
| Location Description | SISKIYOU COUNTY IN YREKA ON ROUTE 3 AT YREKA MAINTENANCE STATION AND ON ROUTE 5 FROM 0.2 MILE SOUTH TO 0.4 MILE NORTH OF SOUTH YREKA UNDERCROSSING #02-0159 |
| QA Service Level | 1 (Verified on 09/24/2024) |
Owner Lab
- CT D02 - Redding Northern Regional Laboratory
Sample Information
| Sample Taken Date | 11/03/2025 | Sample Unique Key | 72 |
|---|---|---|---|
| Date that the sample was received by the laboratory/organization performing the testing | 11/04/2025 | Sample type | Production Start-Up |
| A brief description of the sample | 2 Bags RAP | The quantity of what the sample constitutes | Production Start-Up Evaluation |
| From where was the sample collected | Manufacturer | First name of sampler or witnessed by | Giuliano |
| Last name of sampler or witnessed by | Giuntoli | Title of sampler | JET |
| Telephone number of sampler | Laboratory sample identification | D80115B | |
| Linked DIME Sample ID | The fabricator/manufacturer/facility name | JF Shea Construction - Fawndale Rock and Asphalt - Redding, CA | |
| Transportation Laboratory (TL) Number | 877608 | Inspector Lot Number from the Transportation Laboratory (TL) Form | |
| Structure unique identifier | Structure name | ||
| Bid Item | Not set |
Material Information
| Material Type | Reclaimed Asphalt Pavement | RAP Source | Fawndale Rock and Asphalt, Redding, CA |
|---|---|---|---|
| Aggregate Size | Aggregate Source | ||
| RAP Stockpile | Stockpile Size (tons) | ||
| Reclaimed Asphalt Pavement Mix Number |
Combined Gradation Report Information
| Combined Gradation Report Id | Bin Index | Dime Test Id |
|---|---|---|
| 2025-11-17: HMA Aggregates (Size 3/4"): Type A HMA - Continuous Mixing Plant - Sieve Analysis With RAP | 2 | 2025-11-03-72-2 |
Submitted Tests
Sample File Attachments
| File Name | Extension | Date Uploaded | Actions |
|---|---|---|---|
| No results found. | |||
Test File Attachments
DIME Test ID: 2025-11-03-72-1 AASHTO T209-22 (Verified)
DIME Test ID: 2025-11-03-72-2 AASHTO T30-19 (Verified)
DIME Test ID: 2025-11-03-72-3 AASHTO T308-10 (Verified)
