Sample Record
DIME Sample ID 2017-10-26-2
Project Information
| Project Identifiers | Project ID: 211848 DEA: 112T2174 EFIS: 1116000131 |
|---|---|
| DIST-CO-RTE-PM | 11-SD-5-R37.4 - R46.5 |
| Award Date | 12/22/2016 |
| Closeout Date | 05/01/2026 |
| Work Description | (Alternative Delivery) CMGC, San Elijo Highway Bridge Replacement. Replace the San Elijo lagoon highway bridge, construct HOV lanes, construct bike and pedestrian trails and bridge, build multi-use facility at Manchester Ave. |
| Location Description | IN SAN DIEGO COUNTY IN SOLANA BEACH AND ENCINITAS FROM 0.1 MILE NORTH OF LOMAS SANTA FE DRIVE OVERCROSSING TO 0.2 MILE SOUTH OF BIRMINGHAM DRIVE OVERCROSSING |
| QA Service Level | 1 (Verified on 01/31/2017) |
Owner Lab
- CT HQ - Sacramento Structural Materials Testing Laboratory
Sample Information
| Sample Taken Date | 10/26/2017 | Sample Unique Key | 2 |
|---|---|---|---|
| Date that the sample was received by the laboratory/organization performing the testing | 10/30/2017 | Sample type | Quality Assurance |
| A brief description of the sample | QA samples from lots 1 ,4 and 8 | The quantity of what the sample constitutes | 12 |
| From where was the sample collected | Fabricator | First name of sampler or witnessed by | Subramony |
| Last name of sampler or witnessed by | Krishnamoorthy | Title of sampler | QAI |
| Telephone number of sampler | 9514366777 | Laboratory sample identification | Unknown |
| Linked DIME Sample ID | Unknown | The fabricator/manufacturer/facility name | TNT Rebar |
| Transportation Laboratory (TL) Number | Unknown | Inspector Lot Number from the Transportation Laboratory (TL) Form | L88-029-17 |
| Structure unique identifier | Not set | Structure name | Not set |
| Bid Item | Not set |
Material Information
| Material Type | SMTL TM5 - Welded Hoops | Production or Authorization Testing | Production Testing |
|---|---|---|---|
| Service or Ultimate | Ultimate | Rebar Heat Number(s) | 6502762902 |
| Hoop Manufacturer Lot Number(s) | 1, 4 and 8 | Material Standard Code | ASTM A706 |
| Material Grade | 60 | Rebar Size | 6 |
| Diameter of Hoop | 9'-0" | Epoxy Coated | Yes |
| Epoxy Coating Color | Purple | Rebar Manufacturer | Gerdau |
| Welding Company | TNT Rebar | Coating Standards | ASTM A934 |
| Weld Type | Flash Welded |
Submitted Tests
| DIME Test ID | Test Method | Tester Name, Testing Lab | Date Tested | Date Added | Verified? | Release Date | Test Comments | Privacy Level | Actions |
|---|---|---|---|---|---|---|---|---|---|
| No results found. | |||||||||
Sample File Attachments
| File Name | Extension | Date Uploaded | Actions |
|---|---|---|---|
| No results found. | |||
